Laserfiche WebLink
Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Date: <br />April 25, 2023 <br /> Facility Address: <br /> 420 W YOSEMITE AVE, MANTECA <br /> Facility Name: <br /> SAVE ON FUEL <br />Single-Walled Non-Pressurized Piping <br /> 404 □ V □ R □ COSFailure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair (pre-1984)CCR 2643(e), 2661(f) <br />Other Violations <br /> 2010 □ V □ R □ COSUnlisted General violation See below <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br /> 107 HSC 25292.2; CCR 2711(a)(11) Failure to submit and maintain complete and current financial responsibility <br />documents. <br />1). OBSERVATION: Section B of the certificate of financial responsibility document left blank. <br />REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br />CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS) at <br />http://cers.calepa.ca.gov/, and upload the required documents. <br />----------------------------------------------------------------------------------------------------------------------- <br />2). OBSERVATION: Current financial responsibility documents were not found on site. <br />REGULATION GUIDANCE: A copy of current financial responsibility documents are required to be maintained on <br />site. <br />CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br />copy on site. <br />This is a repeat violation, Class II. <br /> 113 CCR 2637(a-d), 2712(b)(1)(F) Failure to conduct secondary containment testing. <br />OBSERVATION: The direct-bury 87 spill container was installed on 7/14/2022 and on the 87 tank . Since concrete <br />was broken near the 87 tank a secondary containment testing of the 87 tank was expected to be performed. <br />Testing has not been completed and is nine months past due. <br />REGULATION GUIDANCE: Secondary containment testing is required to be performed six months after installation <br />and at least every 36 months after. <br />CORRECTIVE ACTION: Immediately schedule this test and provide 48 hours notification to the EHD. <br />This is a Class II violation. <br />FA0001196 PR0231458 SC001 04/25/2023 <br />EHD 23-01 Rev. 12/06/2021 Underground Storage Tank Program OIRPage 4 of 7 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD