Laserfiche WebLink
HVAC Notes <br /> 1. Furnish and install all ductwork in accordance with the latest editions of CMC (SMACNA duct <br /> construction standards), <br /> 2, All pipes, ductwork and conduit shall be installed and seismically braced per SMACNA's Seismic Restraint B-LINE B359 TWO HOLE <br /> Guidelines, ❑SHPD pre-approval #R0010, 909CONNECT❑R - ATTACH TO ARCH ITECTU RE <br /> 3, All contractor furnished equipment installation and startup instructions shall be kept with the piece of <br /> equipment in weatherproof pouches until final inspection, After final inspection, three sets of operation, EC-1 - KITCHEN REPLACMENT SIDE OF EVAP COOLER W/2 a" <br /> installation, maintenance and start-up instructions shall be given to the Owner for each piece of equipment EVAPORATIVE COOLER MACHINE BOLTS WITH WASHERS, <br /> per the Co. Green Building Code. PR❑VIDE i"Ox2" LONG D❑BLE <br /> 4. All Fire and Fire Smoke Damper installation instructions shall be made available to the inspecting authority for NUTTED CLOSED EYE FOR CHAIN <br /> their review, TO ATTACH TO CONNECTOR <br /> 5, All penetrations through fire rated assemblies shall be fire stopped and sealed with a material that meets or <br /> exceeds the `T' rating of the assembly penetrated, Materials to be used for sealing shall be coordinated with PR❑VIDE H❑LDD❑WN AT EACH ARCHITECT <br /> the General Contractor to provide one brand onsite, CORNER, STAND WILL PREVENT <br /> 6. Install all pipe and duct insulation materials per T-24 requirements, All material to be installed shall meet CBC UNIT FROM MOVING LATERALLY NJ ASSOCIATES <br /> flame and smoke requirements per note 11, AND CHAIN WILL PREVENT UNIT 22769 N BENDER ROAD <br /> 7. All work on this project shall conform to the following codes) FROM TIPPING, UNIT WEIGHT ACAMPO CA 95220 <br /> WITH STAND 650# <br /> 2016 CBC 209.727.2040 <br /> 2016 CPC " K AIN <br /> www.njaarchitecture.com <br /> 2016 CMC TILL SNUG AGAINST SIDE OF <br /> 2016 CEC EVAP COOLER <br /> 2016 CALIFORNIA GREEN BUILDING C❑DE, CLIENT <br /> 14A-0 S❑LID CHAIN CUT TO <br /> 8. All wye branches connected to a diffuser, grille or register shall have a manual volume damper installed in the LENGTH AND WELD ATTACHMENT JOE HADDAD <br /> wye branch. ❑BD's shall only be used when wye branches will be installed over inaccessible ceiling areas or in LINKS CLOSED P.O. BOX 691863 <br /> the slab of the building. Dampers shall be fabricated of the same gauge as the duct with 1" standoff, locking <br /> quadrant, and handle, Fasten red ribbon to handle to mark location, WELD i"Ox1" CLOSED EYE TO STOCKTON CA 95629 <br /> 9, All gas pipe to be schedule 40 with screwed fittings, All air conditioning/refrigeration condensate drain lines ANGLE IR❑N STAND 209 481 8981 <br /> shall be schedule 40 PVC run to the an approved receptor, Set pipe on redwood blocks with 24 ga GI cover SEE RA5,6,7 AND 8 FOR ANGLE <br /> unless otherwise shown differently on drawings, a IRON STAND CONSTRUCTION AND <br /> 10. Provide smoke detectors in the supply air duct on all units when the aggregate cfm exceeds 2000 cfm of all ATTACHMENT <br /> equipment serving a room or more than one room and the room has no direct exits to the exterior. Duct PROJECT <br /> smoke detectors shall be installed after the supply fan before any branch takeoffs. When more than one <br /> unit serves a TI space and the aggregate cfm of the units serving the TI space exceeds 2000 cfm, all HVAC LODI BOWLING <br /> equipment shall have duct smoke detectors, All duct smoke detectors shall be wired to shut down all units 302 N SACRAMENTO STREET <br /> when a single unit alarms, When fire detection or alarm systems are provided for the building, all smoke EC - 1 SEISMIC HOLD D❑ WN LODI CA 95240 <br /> detectors including those installed for fire smoke dampers shall be supervised by such systems per 608A CMC, 3/4"-1'0" M� <br /> Such connections shall be shown on the deferred fire alarm submittal, <br /> 11. Such connections shall be shown on deferred fire alarm submittal. <br /> 11. All exposed ductwork shall be GI pipe and fittings. Line all rectangular duct with insulation with the R-value <br /> Listed in T-24 for the location of the duct (attic, conditioned or outside). All duct materials from insulation <br /> to mastics including but not limited to sheet metal, insulation, liners, plastics, rubber cements, latex, etc, shall <br /> be made of materials with a Flame spread <=25 and smoke <=50, <br /> 12. It is the responsibility of the Mechanical Contractor to coordinate the installation of his work including <br /> equipment substitutions with the other trades including but no limited to electrical, fire sprinkler, framing and <br /> plumbing, <br /> 13. Insulate all ductwork per the T-24 energy requirements found in the T-24 compliance report. All ductwork SELF FLASHING UNIT EE PLANS FOR <br /> shall be tested for leaks with a maximum static pressure in the duct of 1.0", maximum leakage shall not exceed DUCT SIZES <br /> 4% of the total supply and return air volumes, <br /> 14. Contractor shall label all equipment with unique identification using plastic engraved plates with 1/2" tall <br /> Lettering indicating the equipment number and state the areas served by the equipment, See specifications on N❑LL SM PRODUCT <br /> dwgs, WALL CAP, SIZE AS <br /> 15. All flex duct will be stretched as tight as possible and as per manufacturers listing to avoid all kinks and SHOWN ON DRAWINGS. <br /> sagging. <br /> 16. All smoke detectors shall be tested as required with an approved smoke system per the City of Lodi's <br /> standards in the presence of the inspector or fire Marshall, <br /> 17. All systems shall require an air balance report upon final inspection. Submit reports on NEBS or NABC forms WALL CAP K2 <br /> an independent certified air balance showing system has been balanced and OSA quantities set to that shown DETAIL M0.1 <br /> on drawings, <br /> 18. Condensate drain lines installed in direct or indirect sunlight shall be UV resistant CPVC or PVC pipe and shall <br /> be painted to protect from UV radiation, <br /> 19. Seal all joints and seams with DP-1010 duct sealer, EC- <br /> T-24 MECH AND PLUMBING MANDATORY FEATURES 12 GA < CLIP - ATTACH DRAIN - SEE PLUMBING <br /> TO EC - 2#8 SM SCREWS <br /> EACH POST ABOVE WATER LINE FOR C❑NTINUATI❑N <br /> 1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY PER SECTI❑N 110,2 - SEE SCHEDULES ON M-0. IN PAN, 2-1/4' LAGS TO <br /> PLYWOOD EM2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTI❑N 120,2 FOR THERMOSTATS AND DDC CONTROLS - SEE DETAILS ON PENS RAT ONSE WATER TIGHT <br /> MO, 4x BLOCKING FOR DRAIN <br /> 3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION 110.3 OR 6' GA CHANNEL <br /> 4. USE OF PIL❑T LIGHTS ON HVAC, GAS C❑❑KING POOL AND SPA HEATERS PROHIBITED PER SECTION 110,5 SET BLOCKING IN MASTIC <br /> 5. LAVAT❑RIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP AT 110°F OR LESS PER SECTION 110,3 - SEE PLUMBING 1-1/8' PLYWOOD TOP W/ <br /> SCHEDULE 24 GA GI COVER - ATTACH <br /> TOP TO CURB W/1/4'X2' LAGS <br /> 6. VENTILATI❑N REQUIREMENTS PER 120,1,1o,c&d M-1 AIR BALANCE 24' ❑C ALL SIDES <br /> 7. NATURAL VENTILATI❑N PER 120,1,b,1 N/A 14 GA GI ROOF CURB <br /> & CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE M-0 AND NOTES, 12' MIN HT PROVIDE INTERNAL <br /> 9, SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See schedules on M-0 SUPPORT EVERY 54' <br /> 10, ISOLATION AREA DEVICES PER 122,8 N/A 26 GA GI <br /> COUNNG <br /> 11. PIPE INSULATI❑N PER 120,3, SEE NOTES, TABLE 120.3-A FILL VOID SPACE <br /> 9 FILL VOID SPACE W/ <br /> 12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE M-0, NOTES AND SPECIFICATI❑NS RIDGID INSULATION N <br /> 13. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END OF PROJECT PER SECTI❑N 120.5, 120.7 AND 120.8 - SEE T24 FINISH R❑❑FING - ROLL <br /> DRAWINGS FOR FORMS REQUIRED (1-17) TO BE SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC AND PLUMBING UP CURB AND ATTACH T <br /> SYSTEM, AND FOR EACH HVAC AND PLUMBING PIECE OF EQUIPMENT, NAILER <br /> 3/8'Ox3-1/2' LAG BOLT - EMBED <br /> 3' MIN, PLACE 48'❑Crrn <br /> SEE STRUCT DWGS <br /> FOR TRUSSES <br /> 4x BLOCKING BY G6 PROFESSIONAL STAMP <br /> EC— CURB MOUNT 3 5s`°NAL Fti <br /> G. <br /> c NW M29759" <br /> U) REN. 6-30=20 Q <br /> cNA NSG�0 <br /> OF C <br /> REVISIONS <br /> No. Description Date By <br /> Project 17028 <br /> Pawn NR <br /> � ecked GD <br /> By: <br /> PERMIT SET <br /> 0% 1 / 1 <br /> JOB # 2018-061 <br /> SHEET TITLE <br /> GDMD ENGINEERING, INC <br /> Mechanical and Safety Engineers MECHANICAL SCHEDULES, <br /> 212 W Pine St, Ste 4 DETAILS, AND NOTES <br /> Lodi, Ca 95242 <br /> Ph 209-367-0899 <br /> Fax 209-367-0898 <br /> E-mail:gdmdengrinc@sbcglobal.net <br /> I - M 0 <br /> v <br />