My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2024 4:25:57 PM
Creation date
4/3/2023 9:37:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> g . Sensor functionality : Functionality of the monitoring system must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California Code <br /> of Regulations and the Health & Safety Code . If it is determined that a cold start is <br /> necessary , a copy of the alarm history shall be printed prior to performing the " cold <br /> start" of the Veeder Root system and made available at the time of EHD inspection . <br /> h . Verification of the dispenser footprints contained by the under dispenser containment <br /> sumps ( UDCs) . Any potential leaks from piping and fuel filters must drain directly into <br /> UDCs . <br /> i . Visual inspection of the piping within the dispensers <br /> Please be aware that the facility cannot operate the 87A, 87B , 87C , and 91 UST system prior <br /> to the EHD inspection and approval. <br /> 4 . Secondary containment testing for the all 4 new installed UDCs is required six months after <br /> installation . Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual performing the work of a service technician must possess , or work under the <br /> direct and personal supervision of an individual physically present at the work site at all times <br /> while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the CSLB <br /> • A current California UST Service Technician certificate issued by the ICC <br /> • A valid , current certificate of training from the manufacturer( s ) of the component (s) being <br /> tested , or the developer of the testing equipment or test method (s ) being used <br /> 6 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors <br /> State License Board (CSLB) <br /> • A current UST Installation/ Retrofitting certificate issued by the International Code Council <br /> ( ICC) <br /> • A valid , current certificate of training from the manufacturer(s ) of the component ( s) being <br /> installed <br /> 7 . Individuals working under the direct supervision of a qualified UST installer or UST service <br /> technician must , at a minimum , be employed by the person with the CSLB license and possess <br /> all manufacturer certificates of training for the equipment on which they are working . <br /> 8 . The tank owner or operator shall log into the California Environmental Reporting System <br /> (CERS ) at http : //cers . calepa . ca . gov/ and ensure all UST information is current . <br /> 9 . The tank owner or operator shall log into CERS and complete and submit a UST Certification of <br /> Installation/Modification for the UDCs and piping within 30 days . <br /> 10 . All components must be certified by an independent testing organization and labeled as <br /> required by the organization ( UL , ULC , ANSI , API , ASTM , etc . ) . See California Code of <br /> Regulations (CCR) Title 23 , Chapter 16 , Table B for a complete list . <br /> 11 . Permit expires 180 days from the date of approval . If an extension to the expiration date is <br /> required , a written request must be submitted to this office prior to the expiration date . <br /> 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.