My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2024 4:25:57 PM
Creation date
4/3/2023 9:37:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bonded Sump Entry Fitting - Termination Style <br /> for Fuel Handling applications <br /> Installation and Application Instructions <br /> r' <br /> 1. Determine entry hole location and cut entry hole in sump A'.. <br /> wall using appropriate "C" dimensions in Table 1. =} <br /> 2. Using 40-60 grit fresh emery cloth or sand paper, sand <br /> the sump wall surfaces,inside and outside,to the outside <br /> diameter of the alignment rings.All glazed surface must <br /> be removed. Once finished sanding, remove all dust <br /> from the sanded area with a clean, dry cloth or brush. r <br /> Do not use compressed air or bare fingers. <br /> 3. Place two alignment rings on sump entry fitting and <br /> insert through sump wall from outside the sump. Locate <br /> the 1/4 inch threaded outlet to the desired angular \ <br /> location. <br /> If this fitting is used in an Open (Drainage) System, - <br /> locate the 1/4 inch threaded outlet in the 6 o'clock <br /> position. <br /> System 3x2 Part No. 4x3 Part N�v- <br /> Leave 1/4 inch plastic threaded outlet protector in place <br /> until 1/4 inch fitting installation. Red Thread IIA or 012030-626-0 012040-626-0 <br /> Dualoy 3000/1- <br /> 4. <br /> 000/L4. Dry fit primary pipe and rotate the two rings until the <br /> desired angle is reached. Maximum allowable offset is Dualoy 3000/LCX* 22856830 33856830 <br /> 50. *Includes Closure Nipple <br /> Make alignment marks on the rings, the sump entry <br /> fitting, and the sump wall. Be sure to mark the rings so <br /> they can be placed in the same location and sequence <br /> during bonding. <br /> rSUMP WALL <br /> 1� 117 <br /> OUTSIDE <br /> Dimensions <br /> TABLE 1 -FittingSUMP <br /> Size A B C INSIDE <br /> Inch Inch Inch Inch SUMP A <br /> 3 x 2 6.88 4.00 4.00 B <br /> 4 x 3 6.88 4.00 5.00 <br /> NOTE:These fittings can only be bonded to flat walled, _ _ C <br /> fiberglass sumps.DO NOT install on thermoplastic or — T — <br /> round sumps. C <br /> HOLE <br /> DIA <br /> RETAINING ALIGNMENT ENTRY TERMINATION <br /> RING RINGS FITTING BODY <br /> KEY Fiber Glass Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.