Laserfiche WebLink
WASTE DISCHARGE REQUIREMEIN'rS -2- <br /> FORWARD INC.,FORWARD LANDFILL <br /> SAN JOAQUIN COL-,TTY <br /> 5. Waste management units at Forward are described in the following table. The acreage shown (211 <br /> ac.) is greater than the size of the property (157 ac.) because some units overlap. <br /> Unit Area, <br /> areal acres Classification Description of Unit Status <br /> A 8.0 Class I landfill Four trenches with compacted clay liner and Postclosure maintenance& <br /> dendritic LCRS.Built 1973. Contains monitoring. RCRA closure <br /> designated and hazardous waste. completed in 1989.Stopped <br /> receiving wastes in 1984. <br /> B—North 2.8 Class III landfill Unlined.Construction debris and inert Temporarily inactive since <br /> waste.Built 1978 1986. <br /> B 12.1 Class III landfill Unlined.Nonhazardous solid waste Temporarily inactive since <br /> 1986. <br /> C 3.9 Class III landfill Compacted clay liner on floor,dendritic Temporarily inactive since <br /> LCRS. Built 1984 at south end of WMU A 1990. <br /> D-87 2.5 Class III landfill 2-foot compacted clay liner on floor, Temporarily inactive. <br /> dendritic LCRS.Built 1987. <br /> D-88 N 4.6 Class III landfill 4-foot compacted clay liner on floor, Operating <br /> dendritic LCRS. <br /> D-88 S 1.5 Class III landfill 4-foot compacted clay liner on floor, Operating <br /> dendritic LCRS.For non-acid leachate <br /> generating waste. <br /> D-89 3.5 Class III landfill 4-foot compacted clay liner,blanket LCRS. Operating <br /> D-93 4.6 Class II landfill Composite liner with 2-feet of compacted Scheduled for construction in <br /> clay, 60-mil HDPE liner, blanket LCRS. Fall, 1993. <br /> Future D 47.5 Class 1I landfill Composite liner with 2-feet of compacted Permitted.To be constructed <br /> units clay,HDPE liner,blanket LCRS. as <br /> E 4.9 Class II landfill 2-foot compacted clay liner,blanket LCRS. Operating.First phase <br /> For coal ash only. known as Eastern Ash Pit. <br /> F— 1.46 Class H surface Single compacted clay liner.To be replaced Operating.For landfill <br /> Intmim, impoundment by 2 new impoundments as landfill units leachate only. <br /> expand.Built 1988. <br /> F—North 5.5 Class II surface Designed to meet Class II standards. Proposed for constriction <br /> impoundment north of Littlejohn Creek. <br /> F-South 2.5 Class II surface Designed to meet Class 1I standards. Proposed for construction <br /> impoundment south of Littlejohn Creek <br /> for leachate from WMU H. <br /> G—North 51.6 Class II land For treatment of soils contaminated with Operating.51.6 acres <br /> max. treatment unit petroleum hydrocarbons&other approved cunrently available for WMU <br /> compounds.Includes soil storage and clay G-North <br /> lined sludge drying areas. <br /> G92-1,2, 1.8 Class II Four adjacent units with 40-mil PVC liner Operating. Units are within <br /> 3 and 4 waste piles (base),blanket LCRS,compacted clay liner WMU G area.Leachate <br /> (top),upper LCRS, &operations laver. collected in lined sump. <br /> G—South 27.5 Class H land Same design as G-North Proposed for contraction <br /> max. treatment unit south of Littlejohn Creek. <br /> H 24.9 Class II landfill Composite liner with 2-feet of compacted Proposed for contraction <br /> clay, HDPE liner, blanket LCRS. south of Littlejohn Creek. <br />