My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1994-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 2:28:24 PM
Creation date
4/7/2023 2:11:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
680
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -5- <br /> FORWARD INC..FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 21. Surface drainage is to the South Fork of South Littlejohn Creek, which is tributary to South <br /> Littlejohn Creek, which flows into Littlejohns Creek, tributary to French Camp Slough,hence San <br /> Joaquin River and the Delta. <br /> 22. The beneficial uses of these surface waters are recreation, aesthetic enjoyment, and preservation and <br /> enhancement of fish, wildlife and other aquatic resources. <br /> 23. There are no known Holocene faults within 200 feet of the Forward facility. The closest active fault is <br /> the Greenville Fault which is approximately 28 miles west-southwest of the site. The Discharger <br /> estimates the highest local ground acceleration would come from an earthquake on the Midland fault <br /> 24 miles west of the site where the most recent displacement is estimated to be early Oligocene (35 <br /> million years ago). A maximum credible earthquake of magnitude 7.0 on the Midland fault would <br /> produce a ground acceleration of 0.18 g at the facility. <br /> OPERATION OF FACILITIES <br /> 24. The Discharger proposes to increase waste receipts to an average rate of 3,800 tons per day with a <br /> peak daily rate of 4180 tons per day. <br /> 25. The transfer station/ source recovery facility is south of Littlejohn Creek. The Discharger proposes <br /> to expand this facility from 12,000 square feet to 50,000 square feet. Processed materials include <br /> baled cardboard and paper, ferrous and nonferrous metals, glass. plastic and wood. Recovered <br /> wastewood. lumber, and brush are placed in a wood waste stockpile area, ground and processed in a <br /> wood grinder,then hauled off-site. Other recovered materials are stored on-site and shipped to market <br /> as needed. Remaining unrecyclable wastes are landfilled. <br /> 26. The following disposal rates are based on 1992 data. Asbestos is discharged to WMU D at a rate of <br /> about 7,000 cubic yards per month. Coal ash is placed in WMU E at a rate of about 2,600 cubic yards <br /> per month.Nonhazardous solid waste, primarily commercial waste, is discharged to WMU D at a rate <br /> of about 7,700 cubic yards per month. <br /> 27. The Discharger plans to expand the landfill units in five general phases with construction of modules <br /> within each phase. Future expansion north of the south fork of South Littlejohns Creek will be in <br /> WMU D with each module identified with the year of construction,e.g. WMU D93. The vertical <br /> expansion of WMU D over WMUs B. C, D87, D88N, D88S, D89 and Eastern Ash Disposal Pit <br /> WMU E occurs in Phase H.The lateral expansion of WMU D to the west happens in Phase III. The <br /> filling of WMU D to final grades occurs in Phase IV. The construction of WMU H, the landfill unit <br /> south of Littlejohn Creek,occurs in Phase V. The phases will not necessarily be completed <br /> sequentially. <br />
The URL can be used to link to this page
Your browser does not support the video tag.