Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS -13- <br /> FORWARD INC..FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 26. As site conditions change,WMU G may be shifted to another point in the area described in <br /> Attachment B. The new location must be approved by Board staff. <br /> 27. Each old location of WMU G must be closed according to Chapter 15. Closure shall include <br /> testing of the old location for the parameters described in the land treatment section of Monitoring <br /> and Reporting Program No. 94-014 . <br /> 28. The maximum depth of the treatment zone shall not exceed five feet from the initial soil surface. <br /> 29. Treated soil from WMU G shall be used as alternative daily cover in compliance with Title 14, <br /> foundation material for final cover, or discharged to a landfill unit in compliance with this Order. <br /> 30. Soil piles stored in WMU G shall at all times be completely covered with a synthetic liner,except <br /> during treatment. <br /> 31. Soils containing contaminants other than petroleum hydrocarbons and BTEX(for example, <br /> chlorinated hydrocarbons)shall not be placed in WMU G without prior approval of the Executive <br /> Officer. <br /> 32. WMU G shall be graded so that storm water runoff is collected within the unit for appropriate <br /> disposal. <br /> WASTE PILE SPECIFICATIONS <br /> 33. Waste piles constructed for treatment of petroleum contaminated soils shall be within the area <br /> designated for WMU G.Design and construction plans and specifications shall be submitted to <br /> the Executive Officer for approval before construction of any waste pile.After construction, a <br /> cowtraction quality assurance report shall be submitted to the Executive Officer and approved by <br /> Board staff prior to operation of the waste pile. <br /> DRYING OPERATION SPECIFICATIONS <br /> 34. Sludges from water or wastewater treatment plants may be disposed of by spreading on a one <br /> foot thick,compacted clay pad that is bermed to prevent runoff. Sludges shall be handled in such <br /> a manner as to allow drying of the waste with no percolation of liquid or waste constituents <br /> through the bottom of the clay pad. Once the waste has dried. it and any soil it has contacted shall <br /> be moved to WMU D.or WMU H for disposal. The clay pad shall be rebuilt to its original <br /> thickness after each drying cycle. This operation may be done from May through October. <br />