Laserfiche WebLink
MONITORING AND REPORTING PROGRAM -10. <br /> FORWARD INC..FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> GROUND WATER MONITORING POINTS(continued) <br /> Elevation of Elevation of <br /> Well No. Top of Screen I Bottom of Screen Comments Locations shown on Attachment D <br /> MW-14 -21.34 -41.34 Downgradient from WMU A/B/C/D complex <br /> MW-14B -36.36 -56.36 <br /> MW-15 -22.68 -42.68 Downgradient from WMU A/B/C/D complex <br /> MW-17 -25.90 -48.40 Downgradient from Future D Area <br /> MW-18 -26.28 -49.28 Downgradient from WMU G pads&Future D Area <br /> MW-19 -26.13 -48.88 Downgradient form WMU D-93 <br /> MW-20 -26.88 -50.38 U2jEadient from Future D area <br /> VADOSE ZONE MONITORING POINTS <br /> L simeter No. Comments Locations shown on Attachment D <br /> LY-A 10 feet below sump of Trench 1,WMU A <br /> LY-El 8 feet below sump of eastern most pit of WMU E <br /> LY-E2 <br /> LY-H Gathers background samples at depth of 35',south of creek <br /> LYBP-1 Beneath WMU G92 <br /> LYBP-2 <br /> LYBP-3 <br /> LY-D93 Under sump of WMU D93 <br /> LY-1F Under Interim F Surface Im oundment <br /> 4 . Points of Compliance <br /> The Points of Compliance for surface water are the downstream sampling points identified <br /> above for surface water monitoring points. The Points of Compliance for ground water are the <br /> downgradient wells identified above for ground water monitoring points. The Points of <br /> Compliance for vadose zone monitoring program are the lysimeters identified above other than <br /> the background lysimeter. <br /> 5 . Compliance Period <br /> The Compliance Period for the facility shall be the number of years equal to the active life of <br /> the facility plus the closure period. Each time the Standard is exceeded (i.e., a release is <br /> discovered), the facility begins a Compliance Period on the date the Board directs the <br /> Discharger to begin an Evaluation Monitoring Program. If the Discharger's Corrective Action <br /> Program (CAP)has not achieved compliance with the Standard by the scheduled end of the <br /> Compliance Period,the Compliance Period is automatically extended until the facility has been <br /> in continuous compliance for at least three consecutive years. <br />