Laserfiche WebLink
- 3 - <br /> PA - 2200279 ( SA) <br /> 9 ) This project is subject to the NPDES Region -Wide Permit requirements and shall comply <br /> with the following conditions . Prior to release of the grading permit , plans and calculations <br /> shall be submitted and approved by the Public Works Department ® Water Resources <br /> Division ( 209 - 468 - 3605 ) : <br /> a ) Treatment : A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County ' s 2023 Storm Water Quality Control <br /> Criteria Plan ( SWQCCP ) . <br /> b ) Hydromodification : A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County ' s 2023 SWQCCP . <br /> c) Trash : A registered professional engineer shall design the site to comply with the <br /> trash control requirement outlined in the County ' s 2023 SWQCCP . <br /> 10 ) Prior to release of the grading permit , the owner shall enter into an agreement with San <br /> Joaquin County for post- construction maintenance of stormwater quality facilities . <br /> 11 ) Prior to release of the grading permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan ( SWPPP ) to Public Works . A copy of the approved SWPPP and all <br /> required records , updates , test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request . <br /> 12 ) Applicant shall file a Notice of Intent ( NOI ) with the State Water Resources Control Board <br /> ( SWRCB ) and comply with the State " General Permit for Storm Water Discharges <br /> Associated with Construction Activity " . The Waste Discharge Identification Number <br /> (WDID) , issued by SWRCB , shall be submitted to Public Works prior to release of the <br /> grading permit . Contact the SWRCB at 1 - 866 - 563 - 3107 for further information . <br /> 13 ) The applicant shall comply with the State Water Resources Control Board General Order <br /> No . 2014 - 0057 - DWQ , " General Permit for Discharges of Storm Water Associated with <br /> Industrial Activities Excluding Construction Activities " permit . The WDID for the Industrial <br /> General Permit , or exemption from , issued by SWRCB shall be submitted to Public Works <br /> prior to release of the grading permit . <br /> Informational Notes : <br /> ( i . ) Wastewater shall not be allowed into the storm drainage system . <br /> ( ii . ) The project will enact appropriate source control BMPs to prevent the discharge of <br /> trash offsite . <br /> CH : GM <br />