Laserfiche WebLink
Complaint Investigation Summary <br /> Report #: 5105 <br />COMPLAINT ID: C00054404 Site Location: 4245 WEST LN <br />Activity Summary <br />Activity Date Recorded by <br />11/17/2021 Emails with SO Leonard C. Discussing the next phase of cleanup. I had suggested SANGALANG <br />that the south bank be cleaned next because of complainant's phone call. Dep. <br />Cagulada suggests continuing on the north bank, then the south bank west of the <br />railroad, and lastly the south bank between the railroad and West Ln. <br />I responded with my thoughts about the complainant's point of view. The homeless <br />would be pushed and concentrated into the area where the complainant is having <br />the most problems with. <br />,11/17/2021 Email from Zoey M. She's asking for Word form of the Evaluations. She said that SANGALANG <br />wording needs to be sufficiently detailed for CVFPB to get funding for the <br />reimbursement. I emailed Zoey back with the evaluations in Word documents. <br />Also asked about next phase and another meeting after Thanksgiving but before . the posting date. <br />11/23/2021 Received Stockton PD's calls for service information. I emailed it to the ERT <br />group. Zoey responded saying that the information is not sufficiently narrowed to <br />the area of the encampment to be relied upon for purposes of determining <br />whether the encampment can close due to a health and safety risk based on the <br />calls. The planned action will move forward based on the ERT's findings during the <br />evaluation. <br />Received email from Dep Cagulada. Emailed response. <br />Received signed evaluations from county counsel, Zoey M. She also sent to <br />Sandy R (CAO) for her signature. <br />SANGALANG <br />12/01/2021 Prepared paper work for the posting at Calaveras River. SUSZYCKI <br />12/02/2021 Posting of Sites #1 and #2 with Public Works Channel Maintenance (Mike M.) SANGALANG <br />After postings, drove west on the bike path along the river to El Dorado St. Took <br />some pictures of encampments on the north bank. <br />12/02/2021 Photo logs of the postings of Sites #1 and 2. SANGALANG <br />12/06/2021 Meeting with CVFPB, DWR, PW, and CC. Funding for tomorrow's cleanup is not SANGALANG <br />yet finalized. A new Scope of Work and Cost Sheet were distributed this morning <br />by CVFPB. New date of cleanup will possibly be next week, December 14, 15, <br />and/or 16 pending finalized cost sheet. <br />Teams meeting with David T (PW) later again in afternoon to discuss EHD's input <br />on the cost sheet. <br />5105.rpt <br />Page 3 of 6