Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 1 Diesel <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time Brine Filled Brine Filled <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading AB2481 AB2481 <br /> Pass/Fail Criteria Compliant Compliant <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 Prod 91 Prod Diesel Prod VIR <br /> Pipe Manufacturer <br /> Test Start Time 9:00 9:00 9:00 9:15 <br /> Initial Reading 5 psi- 5 psi 5 psi 5 psi <br /> - - Test End Time 10:00 - 10:00 10:00 10:16 '-- ---- <br /> Final Reading 5 psi 6 psi 5 psi 6 psi <br /> Change in Reading 0 0 0 0 - <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ® Pass ❑ Fail N Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 87 Vent 91 Vent Diesel Vent <br /> Pipe Manufacturer <br /> Test Start Time 9:00 9:00 9:00 <br /> Initial Reading 6 psi 6 psi 5 psi <br /> Test End Time 10:00 10:00 10:00 <br /> Final Reading 5 psi 6 psi 5 psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results N Pass ❑ Fail N Pass ❑ Fall ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fall"and any repairs made before or during the tightness fest must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />