My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2023 11:34:14 AM
Creation date
4/12/2023 4:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 1 Diesel <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time Brine Filled Brine Filled <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading AB2481 AB2481 <br /> Pass/Fail Criteria Compliant Compliant <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 Prod 91 Prod Diesel Prod VIR <br /> Pipe Manufacturer <br /> Test Start Time 9:00 9:00 9:00 9:15 <br /> Initial Reading 5 psi- 5 psi 5 psi 5 psi <br /> - - Test End Time 10:00 - 10:00 10:00 10:16 '-- ---- <br /> Final Reading 5 psi 6 psi 5 psi 6 psi <br /> Change in Reading 0 0 0 0 - <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ® Pass ❑ Fail N Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 87 Vent 91 Vent Diesel Vent <br /> Pipe Manufacturer <br /> Test Start Time 9:00 9:00 9:00 <br /> Initial Reading 6 psi 6 psi 5 psi <br /> Test End Time 10:00 10:00 10:00 <br /> Final Reading 5 psi 6 psi 5 psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results N Pass ❑ Fail N Pass ❑ Fall ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fall"and any repairs made before or during the tightness fest must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.