Laserfiche WebLink
Review Comments <br />Reviewer Comments <br />Employee: <br />Role <br />Review Type <br />Completed Date <br />Coppola, Mija A <br />HASP Reviewer <br />Approve <br />2/6/2009 <br />Employee: <br />Role <br />Review Type <br />Completed Date <br />Vollertsen, Patricia A <br />Quality Reviewer <br />NA <br />3/3/2009 <br />Looks really good and these are so easy to read. Some comments Step 1, hazard 2: Consider <br />including page number from handbook Step 2, hazard 2: Consider using "hand/muslce fatigue <br />rather than "strain". Step 3, critical action 1: Is Tyvek ever required for really wet soils? Step 3, <br />harard 3 and step 5 hazard 1: Consider muscle "fatigue" rather than strain Step 5, hazard 1: Do you <br />ever have to move to the next spot before filling in hole? If so, may want to add in the CA -if you <br />have to walk away before filling, mark hole to alert others. Step 6 - as this is a JLA for hand <br />augering, would you maybe just reference the "well installation JLA" rather than adding the step <br />here? If that doesn't make sense, need to look at hazard 5 as it notes that debris can get in eyes, <br />but the CA talks about a dust mask - may want to reword that debris in eyes, nose and mouth can <br />occur when working with soil, grout, and bentonite and for CA include reference to eye protection.