Laserfiche WebLink
During the site inspection look for the following: ("YES" requires additional investigation and the utility <br />must be marked properly prior to beginning subsurface intrusive work): <br />Site Inspection Utility Color Codes <br />a)Natural gas line present (evidence of a gas meter)?Yellow Yes No <br />i)Feeder Lines to buildings or homes?Yes No <br />b)Evidence of electric lines:Red <br />i)Conduits to ground from electric meter or along wall?Yes No <br />iii)Conduits from power poles running into ground?Yes No <br />ii)Light poles, electric devices with no overhead lines?Yes No <br />iii)Overhead electric lines present? (See Section l)Yes No <br />c)Evidence of sewer drains:Green <br />i)Restrooms or kitchen on site?Yes No <br />ii)Sewer cleanouts present?Yes No <br />iii)Combined sewer/storm lines or multiple sewer lines?Yes No <br />d)Evidence of water lines:Blue <br />i)Water meter on site or multiple water lines?Yes No <br />ii)Fire hydrants in vicinity of work?Yes No <br />iii)Irrigation systems? (Sprinkler heads, valve boxes, controls in building)Yes No <br />e)Evidence of storm drains:Green <br />i)Open curbside or slotted grate storm drains Yes No <br />ii)Gutter down spouts going into ground Yes No <br />f)Evidence of telecommunication lines:Orange <br />i)Fiber optic warning signs in areas?Yes No <br />iv)Aboveground cable boxes or housings or wires in work area?Yes No <br />g)Underground storage tanks: <br />i)Tank pit present, tank vent present?Yes No <br />ii)Product lines running to dispensers/buildings?Yes No <br />h)Do utilities enter or exit existing structures/buildings? <br />If Yes, confirm the utility markings outside of structure/building match up.Yes No <br />i)Proposed excavation marked in white?White Yes No <br />j)Unclassed utilities / anomalies marked in pink? Pink Yes No <br />k)Overhead Utilities/Communication Lines - Look Up: <br />i)Overhead electrical conduit, pipe chases, cable trays, product lines?Yes No <br />ii)Overhead fire sprinkler system?Yes No <br />l)Overhead Power lines in or near the work area: <br />i)< 50 kV within 10 ft. of work area?Yes No <br />ii)>50 - 200 kV within 15 ft. of work area?Yes No <br />iii)>200-350 kV within 20 ft. of work area?Yes No <br />iv)>350-500 kV within 25 ft. of work area?Yes No <br />v)>500-750 kV within 35 ft. or work area?Yes No <br />vi)>750-1000 kV within 45 ft. of work area?Yes No <br />m)Other: <br />i)Evidence of linear asphalt or concrete repair?Yes No <br />ii)Evidence of linear ground subsidence or change in vegetation?Yes No <br />iii)Unmarked manholes or valve covers in work area?Yes No <br />iv)Warning signs ("Call Before you Dig", etc.) on or adjacent to site? Yes No <br />v)Utility color markings not illustrated in this checklist?Purple Yes No <br />n)Has the Utilities & Structures Checklist been reviewed by the PM or Designee Yes No <br />PM or Designee Name: <br />Name and Signature of person completing the checklist: <br />Date: <br />Do not perform mechanized intrusive work within 30 inches of a utility marking without receiving pre-approval <br />by Corporate H&S . <br />Present