Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name:7-ELEVEN 41216 Date of Testing:6/5/2023 <br /> Facility Address:770 W.Charter Way,Stockton,CA 95206 <br /> Facility Contact: Phone:209-414-9204 <br /> Date Local Agency Was Notified of Testing: 5/29/2023 <br /> Name of Local Agency Inspector(if present during testing):PAUL <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name:TANKNOLOGY INC. <br /> Technician Conducting Test:Jesus Saldivar <br /> Credentials l: r CSLB Contractor rv— ICC Service Tech. r SWRCB Tank Tester r Other(Specify) <br /> License Number(s): <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used By: FV- Hydrostatic F Vacuum F Other <br /> Test Equipment Used:LAKE TEST Equipment Resolution:0.0625 in. <br /> Spill Box#Tank T 1 rul Spill Box#Tank T2 <br /> Identify Spill Bucket(By Tank Spill Box#Tank T3 Diesel- <br /> Number, Stored Product, etc) REGULAR-Fill 1-Direct- PREMIUM-Fill 1-Direct- Fill 1-Direct-Grade level Spill Box# <br /> Grade level Grade level <br /> Bucket Installation Type: rDirect Bury C Direct Bury r Direct Bury C Direct Bury <br /> C: Contained in Sump C Contained in Sump C: Contained in Sump C Contained in Sump <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 16.00 16.00 16.00 <br /> Wait time between applying <br /> 5 min 5 min 5 min min <br /> vacuum/water and start of test <br /> Test Start Time(TI): 09:00:00 09:00:00 09:00:00 <br /> Initial Reading(RI): 16.00 in.1420 16.00 in.H2O 16.00 in.H2O <br /> Test End Time(Tg): 10:00:00 10:00:00 10:00:00 <br /> Final Reading(RF): 16.00 in.H2O 16.00 in.H2O 16.00 in.1420 <br /> Test Duration(TF—TI): 1 hr 1 hr 1 hr <br /> Change in Reading(RF—RI): 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Al 4L Date: 6/5/2023 <br /> 'State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements may be more stringent. <br /> WO:2360225 <br />