Laserfiche WebLink
EXPLANATION <br />mw-I 9 MONTrortiNc WELL <br /> <br />B-1 • EV.STENG SOIL BORING <br />PROPERTY BOUNDARY <br />CENTER LINE <br /> <br />0 PROPOSED VAPOR <br /> <br />PVW ExTRAcTioN WELL <br />PROPOSED AIR SPARC:LNG <br />PSW WELL <br />PROPOSED MONITORING <br />PMW-6 WELL <br /> <br />Cr) <br />PROPOSED SOIL BORING <br />• 6:1 <br />MW-3 <br />• <br />B-1 <br />FORMER <br />FUEL DISPENSER <br />ISLANDS <br />MW-1 <br />B-5 <br />3-6 <br />B-2 <br />13-4 <br />• <br /> <br />HOUSE <br /> <br />PMW-6 <br />DRIVEWAY <br />MW-5 RESIDENTIAL YOSEMITE STR 'EET Ft..\ •.• r.• <br />_ <br />TANK PIT <br />SIDEWALK <br />ACACIA STREET <br />0 20 40 <br />APPROXIMATE SCALE IN FEET <br />PROPOSED SOIL BORING/WELL LOCATION MAP <br />Conrady Service Station <br />1002 North Yosemite StTeet <br />Stockton, &lifornia <br />CLEARWATER GROUP, INC. <br />Project No. <br />D-101 <br />Report Date <br />5/95 <br />Figure <br />1