Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> Has monitoring system certification been completed within the past <br /> 12 months? <br /> Has spill container testing been completed within the past 12 <br /> months? <br /> Has overfill prevention equipment inspection been completed El <br /> within the past 36 months? 0 ` 14 <br /> Has secondary containment testing been completed within the past ❑ <br /> 36 months? 2, d <br /> Has tank tightness testing been completed within required <br /> timeframes? vm,u �— <br /> Has line tightness testing been completed within the required 0 0 0 <br /> timeframes? <br /> Other Test/ Maintenance: ❑ ❑ <br /> Other Test/ Maintenance: 0 <br /> Other Test/ Maintenance: 13 0 <br /> �1. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility D/ <br /> employee training within the past 12 months? <br /> .� ANTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> VVJ40V"Wt� � IS YID,I YO 5 1KI2 <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> 4 <br />