My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOVELACE
>
2323
>
2800 - Aboveground Petroleum Storage Program
>
PR0523546
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2023 1:05:40 PM
Creation date
5/2/2023 1:03:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0523546
PE
2832
FACILITY_ID
FA0001434
FACILITY_NAME
LOVELACE TRANSFER STATION
STREET_NUMBER
2323
STREET_NAME
LOVELACE
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20406020
CURRENT_STATUS
01
SITE_LOCATION
2323 LOVELACE RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br />have not been addressed for LOVELACE TRANSFER STATION as of April 20, <br />2023. <br />Open violations from February 17, 2022 inspection <br />Violation #301 - Failed to amend Plan as necessary. <br />OBSERVATION: The facility failed to amend the Spill Prevention, Control, and Countermeasure (SPCC) Plan within <br />six months of when there was a change in design, construction, operation, or maintenance, which affects the <br />facility’s discharge potential. 170 gallon portable diesel tank located on a truck has been in service since August <br />2018. This tank is not included in the SPCC plan. <br />REGULATION GUIDANCE: (a) Amend the SPCC Plan for your facility in accordance with the general requirements <br />in § 112.7, and with any specific section of this part applicable to your facility, when there is a change in the facility <br />design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § <br />112.1(b). Examples of changes that may require amendment of the Plan include, but are not limited to: <br />commissioning or de commissioning containers; replacement, reconstruction, or movement of containers; <br />reconstruction, replacement, or installation of piping systems; construction or demolition that might alter secondary <br />containment structures; changes of product or service; or revision of standard operation or maintenance procedures <br />at a facility. An amendment made under this section must be prepared within six months, and implemented as soon <br />as possible, but not later than six months following preparation of the amendment. <br />(b) Notwithstanding compliance with paragraph (a) of this section, complete a review and evaluation of the SPCC <br />Plan at least once every five years from the date your facility becomes subject to this part; or, if your facility was in <br />operation on or before August 16, 2002, five years from the date your last review was required under this part. As a <br />result of this review and evaluation, you must amend your SPCC Plan within six months of the review to include <br />more effective prevention and control technology if the technology has been field-proven at the time of the review <br />and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. You must <br />implement any amendment as soon as possible, but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation, and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. <br />The following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on <br />(date), and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Ensure that the SPCC Plan has been amended, as required, and it accurately represents <br />facility design, procedures, and policies currently in place. Provide proof of correction to the EHD. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Page 2 of 4
The URL can be used to link to this page
Your browser does not support the video tag.