Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 05/22/2023 1987 W. 11th, Tracy <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> 8484 <br /> DSL O 91 STP 8484 8484 <br /> STP O O 460 460 O O 208 P4 <br /> 208 208 <br /> 20 18 <br /> O <br /> 208 FF 208 VENT 208 <br /> 19 17 <br /> 16 14 C <br /> A <br /> 208 [208 S <br /> 13 <br /> 15 <br /> 12 10 <br /> D ❑ ESO <br /> 208 F208 TLS <br /> 11 9 <br /> 8 6 <br /> F208] 208 <br /> 7 5 <br /> ESO <br /> 4 2 ❑ <br /> 208 [208 <br /> 3 1 <br /> Q1 Runs Dispensers 9/10 & 13/14 & 15/16 & 17/18 & 19/20 <br /> Q2 Runs Dispensers 1/2 & 3/4 & 5/6 & 7/8 & 11/12 <br /> Page 6 of 6 <br />