My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOEING
>
2452
>
1900 - Hazardous Materials Program
>
PR0546193
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2023 4:46:05 PM
Creation date
5/8/2023 4:23:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0546193
PE
1921
FACILITY_ID
FA0026142
FACILITY_NAME
ES OPCO USA LLC
STREET_NUMBER
2452
STREET_NAME
BOEING
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2452 BOEING WAY STE 100
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VESE R IS <br />Contingency Plan <br />Section 4 — Effective Date Supersedes Page <br />Emergency Recogn on 9/20/2021 New 4-1 <br />EMERGENCY RECOGNITION <br />WHEN TO USE THIS PLAN: <br />In the event of an emergency situation, the individual discovering the emergency <br />immediately notifies the Emergency Coordinator or his/her alternate. If neither is <br />available the next alternate listed on the emergency phone number listing should <br />be contacted. The Emergency Coordinator, or alternate, will determine if the <br />situation warrants implementation of this plan. <br />The Emergency Coordinator and Alternate(s) have the authority to commit <br />company resources and initiate requests for assistance to any local outside <br />emergency services agency. The decision must be made by the Emergency <br />Coordinator or the Alternate whether a situation poses a threat to human health <br />or safety to such an extent that evacuation of the facility is required. If evacuation <br />is deemed appropriate, then implementation of this plan is appropriate. Listed <br />below are situations that may require implementation of this plan: <br />An explosion anywhere, anytime at the facility. <br />A fire that, upon discovery, cannot be controlled by fire extinguishers. <br />A release of a toxic or irritating gas in a quantity great enough to threaten <br />human health or the environment. <br />A spill of a hazardous liquid that threatens to escape off-site by way of a <br />sewer or overland flow. <br />A release of a material that creates, or a situation that results in, <br />obnoxious fumes which may threaten human health or the environment. <br />In all emergency situations, the Emergency Coordinator should assess the <br />nature of the emergency in the following order: <br />Is there a need for evacuation? If yes, then proceed to number 2; if no, <br />then proceed to number 8. <br />Issue the signal to evacuate and implement the Contingency Plan. <br />Account for all personnel.
The URL can be used to link to this page
Your browser does not support the video tag.