Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: 701 E. CHARTER WAY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> C STOREKEY <br /> A=ANNULAR Sensor <br /> F=FILLS <br /> . . . . . . . . . . . . . . . . . . . . . . . . V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> L=Turbine/Leak Detector <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . . <br /> B=Brine Sensor <br /> .N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> S=Smart Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C=Floats&Chains <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E=E Stop <br /> . . . . . . . . . . . . .1. . . . . . . . . . . . . . . . . <br /> . .6 . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> R <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T <br /> s. a. 7 s E <br /> . . . . . . . . X. . . . . . . . . . . . . . . X . . . . . . . . . . . . . . . . . . R <br /> ILS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 350 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . A <br /> QQ MENTs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *PIPING* <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) Y <br /> . . . . . . . . . . . . . . . . . . . . . Drawing ofpiping <br /> . . . . . . . . . . . . . . . . . . .. . . exit of sump and <br /> UDC's.No <br /> g7 91 underground <br /> drawing is accurate, <br /> X X <br /> we cannot <br /> A p speculate blue <br /> TL V F 000 <br /> VP TL prints. <br /> . _3ry rlenu rrr,bran zllhzd are Haiwsib1e 10 JF ceY.rfrrrg lw+aeicrax area . <br /> fr assim�tlaprrdareo areftrasde�fnrirf'wvxrrkrkdpr4ip Lhmrrreg <br /> M1 ro scde <br /> Date map was drawn:06/16/21. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />