Laserfiche WebLink
SAN J O A R N Environmental Health Department <br /> i , �V <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> VAN DE POL ENT INC/PACIFIC PRIDE 351 N BECKMAN RD, LODI June 23, 2023 <br /> Single-Walled Non-Pressurized Piping <br /> 404 CCR 2643(e),2661(f) Failure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair(pre-1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 107 HSC 25292.2; CCR 2711(a)(11)Failure to submit and maintain complete and current financial responsibility <br /> documents. <br /> 1)OBSERVATION:The current Certificate of Financial responsibility document have not been submitted to the <br /> EHD. The most recent financial responsibility documents in CERS are dated 01/28/2022 and expired on <br /> 01/27/2023. <br /> REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS)at <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> -------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 2). OBSERVATION: Current letter from the chief financial officer were not found on site. <br /> REGULATION GUIDANCE:A copy of current financial responsibility documents are required to be maintained on <br /> site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> This is a minor violation. <br /> 111 CCR 2637, 2638(e), 2643(g)Failed to notify the EHD 48 hours prior to conducting testing. <br /> OBSERVATION: Routine secondary containment testing were performed on 08/9/2022 without providing notification <br /> to the EHD at least 48 hours in advance. Testing was last performed on 08/03/2020 and the next testing is due by <br /> 08/2023. <br /> REGULATION GUIDANCE: Notification shall be provided to the CUPA at least 48 hours in advance of testing. <br /> CORRECTIVE ACTION: The EHD will not accept these results and testing must be rescheduled with a 48-hour <br /> notification. Immediately schedule these tests and provide 48 hours notification to the EHD. <br /> This is a Class II violation. <br /> FA0003773 PR0231310 SCO01 06/23/2023 <br /> EHD 23-01 Rev.12/06/2021 Page 4 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />