My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 3:10:04 PM
Creation date
5/31/2023 10:29:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #148
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. <br /> P. O. Box 1025 9163721888 PH <br /> 3900 Commerce Drive 9163731172 FAX <br /> West Sacramento, CA 95691-1025 CA Contractor's License#617238 <br /> Customer Job Location Work Order# 167111 <br /> Quik Stop Markets, Inc. Quik Stop Market#148 Z1 Scheduled Date: 6/27/2023 <br /> 165 Flanders Rd 205 W. Lockeford Street Scheduled Time: 10:30:OOAM <br /> Westborough, MA 01581 Lodi, CA 95240 Contact: Michael Karvelot <br /> Customer PO#: 248671746 <br /> Phone: 2093691142 Facility: W31020-148 <br /> Station# : 148 <br /> Contract# <br /> Work To Be Pe ormed: Call type: P3 Service Call <br /> Tank- Remove liquid from spill containers and clean debris <br /> Work Performed: <br /> 6/21/23 Performed and uploaded JSA to Walton work order. <br /> 6/21/23 Upon arrival found liquid in spill containers. Removed 2 gallons of liquid total from all spill containers and placed in <br /> existing hazardous waste drum on site dated 06-21-23. Drum is 3/4 full. Monitor reads all functions normal upon <br /> departure. <br /> 6/23/23 Performed and uploaded JSA to Walton work order. <br /> 6/23/23 Upon arrival found liquid in all fill sumps. Removed 20 gallons of liquid (water) from the grade 87 fill sump and <br /> placed in existing hazardous waste drum on site. Drum is full. Found approximately 100 more gallons in the grade <br /> 89 and 91 fill sumps. Need to return with drums to finish removing liquid from fill sumps. Monitor reads all functions <br /> normal upon departure. <br /> 6/27/23 Performed and uploaded JSA to Walton work order. <br /> 6/27/23 Upon arrival removed 110 gallons of liquid (water) total from the grade 89/91 fill sumps and placed in hazardous <br /> waste drum left on site dated 06-27-23. Drums are full. Monitor reads all functions normal upon depareture. <br /> Open Problems: <br /> 6/23/23 Need to return with two drums to finish removing liquid from the grade 89/91 fill sumps. <br /> Parts Used: <br /> Qty Part# Mfg Mfg Part# New Serial# Desc Reason <br /> 2 309-51011 RES1 DRUM, 55 GAL., D D N/A Drum, 55 Gal. DOT, UN1A2, Open Top New <br /> 2 309-72090; ACCU MHZWCA N/A Label, Hazardous Waste Decal for Drums New <br /> Date Technician Arrival Departure Date Technician Arrival Departure <br /> 6/21/23 Wahlen; Brandon S. 07:30 08:30 6/23/23 Wahlen; Brandon S. 08:23 09.30 <br /> 6/27/23 Wahlen; Brandon S. 10:33 14:30 <br /> Store Stamp&Signature <br /> Technician Signature Customer Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.