My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 3:10:04 PM
Creation date
5/31/2023 10:29:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #148
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer ❑Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: PROTEUS OEL8000111-CLD Series <br /> Sump/UDC ID 87 STP 89 STP 91 STP <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Sump Depth (inches) 42 43 44 <br /> Sump Bottom to Top of 6 6 6 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:23 11:23 11:23 <br /> Initial Reading 6.292 9.860 10.053 <br /> Test End Time 11:38 11:38 11:38 <br /> Final Reading 6.290 9.860 10.051 <br /> Change in Reading -.002 0.000 -.002 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail r Pass © Fail [Cl Pass ❑l Fail <br /> Sump/UDC ID UDC#1-2 UDC#3-4 <br /> Sump Manufacturer Bravo (Steel) Bravo (Steel) <br /> Sump Depth (inches) 9 9 <br /> Sump Bottom to Top of Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 13:09 13:09 <br /> Initial Reading 2.460 6.306 <br /> Test End Time 13:24 13:24 <br /> Final Reading 2.460 6.307 <br /> Change in Reading 0.000 0.001 <br /> Pass Fail Criteria +/-0.002 +/-0.002 <br /> Tightness Test Results 0 Pass 0 Fail © Pass 0 Fail r] Pass © Fail C Pass C Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.