My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015576
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
17266
>
2600 - Land Use Program
>
PA-2300063
>
SU0015576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 4:10:30 PM
Creation date
6/16/2023 9:19:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015576
PE
2635
FACILITY_NAME
PA-2300063
STREET_NUMBER
17266
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
RIPON
Zip
95366-
APN
20322078
ENTERED_DATE
5/4/2023 12:00:00 AM
SITE_LOCATION
17266 E FRENCH CAMP RD
RECEIVED_DATE
5/30/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> PA-2300063 (Z) <br /> 4) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-1135) <br /> 6) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-3605): <br /> a) Treatment: A registered professional engineer shall design the site to treat the <br /> 85th percentile storm as defined in the County's 2023 Storm Water Quality Control <br /> Criteria Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to <br /> comply with the volume reduction requirement outlined in the County's 2023 <br /> SWQCCP. <br /> c) Trash: A registered professional engineer shall design the site to comply with the <br /> trash control requirement outlined in the County's 2023 SWQCCP. <br /> 7) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br /> 8) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request. <br /> 9) Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br /> (SWRCB) and comply with the State "General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number <br /> (WDID), issued by SWRCB, shall be submitted to Public Works prior to release of the <br /> building permit. Contact the SWRCB at(916) 341-5537 for further information. <br /> Informational Notes: <br /> (i) Wastewater shall not be allowed into the storm drainage system. <br /> (ii.) The project will enact appropriate source control BMPs to prevent the discharge of <br /> trash offsite. <br /> CH:DS <br />
The URL can be used to link to this page
Your browser does not support the video tag.