Laserfiche WebLink
-2- <br /> PA-2300063 (Z) <br /> 4) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-1135) <br /> 6) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-3605): <br /> a) Treatment: A registered professional engineer shall design the site to treat the <br /> 85th percentile storm as defined in the County's 2023 Storm Water Quality Control <br /> Criteria Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to <br /> comply with the volume reduction requirement outlined in the County's 2023 <br /> SWQCCP. <br /> c) Trash: A registered professional engineer shall design the site to comply with the <br /> trash control requirement outlined in the County's 2023 SWQCCP. <br /> 7) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br /> 8) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request. <br /> 9) Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br /> (SWRCB) and comply with the State "General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number <br /> (WDID), issued by SWRCB, shall be submitted to Public Works prior to release of the <br /> building permit. Contact the SWRCB at(916) 341-5537 for further information. <br /> Informational Notes: <br /> (i) Wastewater shall not be allowed into the storm drainage system. <br /> (ii.) The project will enact appropriate source control BMPs to prevent the discharge of <br /> trash offsite. <br /> CH:DS <br />