My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 11:23:47 AM
Creation date
6/20/2023 9:28:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all: that apply.) Yes No NA <br /> A 3 GPH EJ 0.1 GPH El 0.2 GPH <br /> Has the testing apparatus been properly calibrated? A ❑ LJ <br /> For emergency generator tank systems, does the LLD create an audible and visual ❑ ❑ <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flaw through the pipe when a A ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ❑ ❑ ❑ <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> mon itorirg system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected ❑ 0 ❑ <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? � ❑ ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> T1 87 Vaporless LD-2000 87 product lime RI Li <br /> T2 91 Vaporless LD-2000 91 product line 0 Ij <br /> ® Q <br /> ElL1 L <br /> Q <br /> j <br /> ❑ ❑ <br /> Ll L <br /> Q Q <br /> Describe all answers marked "No"or"Fail'and proposer!remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired irr Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.