Laserfiche WebLink
SAN J O A R N Environmental Health Department <br /> i y �V <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> S B GAS&MARKET 515 W ELEVENTH ST, TRACY July 05, 2023 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 210 CCR 2715(c)Failure to provide initial training,train every 12 months, and have a trained employee present. <br /> OBSERVATION: The designated operator employee training for Sarajuddin Saraj was not performed. <br /> REGULATION GUIDANCE: The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the <br /> individual performs the duties of a facility employees.The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Initial training shall also include a site-specific practical demonstration that provides both sharing information and <br /> evaluating knowledge for responding to emergencies, leak detection, monitoring alarms, spills and overfills. At least <br /> one of the facility employees present during operating hours shall have current training. <br /> CORRECTIVE ACTION: Ensure that employees have been trained by the designated operator, maintain the list on <br /> site, and submit a copy of the training records to the EHD. <br /> This is a Class II violation. <br /> 214 CCR 2712 Failure to comply with UST operating permit conditions. <br /> OBSERVATION: The diesel tank was converted to bio-diesel approximately mid-May and a permit was not obtained <br /> from the EHD. <br /> REGULATION GUIDANCE: Emergency repairs relating to UST system monitoring and release detection may be <br /> performed by a properly licensed,trained, and certified contractor pursuant to the EHD's policy and a permit <br /> obtained within one business day from the EHD. All other repairs must have a permit submitted to and approved by <br /> the EHD prior to beginning work. <br /> CORRECTIVE ACTION: Immediately obtain a permit from the EHD for the change of product for tank#3 from <br /> diesel to bio-diesel . A"Failure to Obtain a Permit" penalty applies. <br /> This is a minor violation. <br /> 318 CCR 2635, 2637.1,2665, 2712 Failed to meet spill container requirements. <br /> OBSERVATION: The premium direct-bury spill container failed when tested. <br /> REGULATION GUIDANCE:All spill containers shall have a minimum capacity of five gallons and be capable of <br /> containing a spill or overfill until it is detected or cleaned up. <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is <br /> repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection of the EHD. <br /> If the spill container can't be replaced immediately,there is a possibility that the premium UST system may be red <br /> tagged to prevent fuel inputs. <br /> This is a Class II violation. <br /> FA0003539 PR0231400 SCO01 07/05/2023 <br /> EHD 23-01 Rev.12/06/2021 Page 8 of 9 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />