My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015605
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
20450
>
2600 - Land Use Program
>
PA-2300075
>
SU0015605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:06:08 AM
Creation date
6/27/2023 4:55:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015605
PE
2690
FACILITY_NAME
PA-2300075
STREET_NUMBER
20450
Direction
N
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01714041, -42
ENTERED_DATE
5/17/2023 12:00:00 AM
SITE_LOCATION
20450 N KENNEFICK RD
RECEIVED_DATE
9/26/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br />Electric Company <br />wide trench being dug along a 36 inch pipeline, the centerline of the trench would need to be at <br />least 54 inches [24/2 + 24 + 36/2 = 54] away, or be entirely dug by hand.) <br />Water jetting to assist vacuum excavating must be limited to 1000 psig and directed at a 400 <br />angle to the pipe. All pile driving must be kept a minimum of 3 feet away. <br />Any plans to expose and support a PG&E gas transmission pipeline across an open excavation <br />need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work. <br />6. Boring/Trenchless Installations: PG&E Pipeline Services must review and approve all <br />plans to bore across or parallel to (within 10 feet) a gas transmission pipeline. There are <br />stringent criteria to pothole the gas transmission facility at regular intervals for all parallel bore <br />installations. <br />For bore paths that cross gas transmission pipelines perpendicularly, the pipeline must be <br />potholed a minimum of 2 feet in the horizontal direction of the bore path and a minimum of 24 <br />inches in the vertical direction from the bottom of the pipe with minimum clearances measured <br />from the edge of the pipe in both directions. Standby personnel must watch the locator trace <br />(and every ream pass) the path of the bore as it approaches the pipeline and visually monitor <br />the pothole (with the exposed transmission pipe) as the bore traverses the pipeline to ensure <br />adequate clearance with the pipeline. The pothole width must account for the inaccuracy of the <br />locating equipment. <br />7. Substructures: All utility crossings of a gas pipeline should be made as close to <br />perpendicular as feasible (900 +/- 15°). All utility lines crossing the gas pipeline must have a <br />minimum of 24 inches of separation from the gas pipeline. Parallel utilities, pole bases, water <br />line `kicker blocks', storm drain inlets, water meters, valves, back pressure devices or other <br />utility substructures are not allowed in the PG&E gas pipeline easement. <br />If previously retired PG&E facilities are in conflict with proposed substructures, PG&E must <br />verify they are safe prior to removal. This includes verification testing of the contents of the <br />facilities, as well as environmental testing of the coating and internal surfaces. Timelines for <br />PG&E completion of this verification will vary depending on the type and location of facilities in <br />conflict. <br />8. Structures: No structures are to be built within the PG&E gas pipeline easement. This <br />includes buildings, retaining walls, fences, decks, patios, carports, septic tanks, storage sheds, <br />tanks, loading ramps, or any structure that could limit PG&E's ability to access its facilities. <br />9. Fencing: Permanent fencing is not allowed within PG&E easements except for <br />perpendicular crossings which must include a 16 foot wide gate for vehicular access. Gates will <br />be secured with PG&E corporation locks. <br />10. Landscaping: Landscaping must be designed to allow PG&E to access the pipeline for <br />maintenance and not interfere with pipeline coatings or other cathodic protection systems. No <br />trees, shrubs, brush, vines, and other vegetation may be planted within the easement area. <br />Only those plants, ground covers, grasses, flowers, and low -growing plants that grow <br />unsupported to a maximum of four feet (4') in height at maturity may be planted within the <br />easement area. <br />PG&E Gas and Electric Facilities Page 3 <br />Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.