Laserfiche WebLink
Pacific Gas and <br />Electric Company <br />8. Streets and Roads: Access to facilities must be maintained at all times. Street lights may be <br />allowed in the fee strip(s) and/or easement(s) but in all cases must be reviewed by PG&E for <br />proper clearance. Roads and utilities should cross the transmission easement as nearly at right <br />angles as possible. Road intersections will not be allowed within the transmission easement. <br />9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as <br />nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by <br />PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are <br />not allowed. Construction plans must be submitted to PG&E for review and approval prior to the <br />commencement of any construction. <br />10. Signs: Signs are not allowed except in rare cases subject to individual review by PG&E. <br />11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light <br />trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment <br />access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by <br />at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at <br />developer's expense AND to PG&E specifications. <br />12. Construction Activity: Since construction activity will take place near PG&E's overhead <br />electric lines, please be advised it is the contractor's responsibility to be aware of, and observe <br />the minimum clearances for both workers and equipment operating near high voltage electric <br />lines set out in the High -Voltage Electrical Safety Orders of the California Division of Industrial <br />Safety(littps://www.dii-.cLi.�,ov/'I'itle8/sb5g2.11tiiil), as well as any other safety regulations. <br />Contractors shall comply with California Public Utilities Commission General Order 95 <br />(http://www.cL)uc.ca.gov/�,,os/GO95/€o 95 startup page.html) and all other safety rules. No <br />construction may occur within 25 feet of PG&E's towers. All excavation activities may only <br />commence after 811 protocols has been followed. <br />Contractor shall ensure the protection of PG&E's towers and poles from vehicular damage by <br />(installing protective barriers) Plans for protection barriers must be approved by PG&E prior to <br />construction. <br />13. PG&E is also the owner of distribution facilities throughout many of the areas within the <br />state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br />approved by PG&E to ensure that no impact occurs that may endanger the safe and reliable <br />operation of its facilities. <br />PG&E Gas and Electric Facilities Page 6 <br />Public <br />