Laserfiche WebLink
aU ' SAN J O A Q U I N Environmental Health Department <br /> IT, COUNTY Jasjit Kang , REHS , Director <br /> ctii= P Greatness grows here . Muniappa Naidu , REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih , REHS <br /> Elena Manzo , REHS <br /> Natalia Subbotnikova , REHS <br /> December 28 , 2023 <br /> Carrie Miller <br /> Elite IV Contractors <br /> 2535 Wigwam Dr <br /> Stockton , CA 95205 <br /> carrie@eliteiv . com <br /> Re : BlackHawk Petroleum SR0087536 <br /> 5611 E Waterloo Rd . , Stockton CA 95215 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • replace the direct- bury 87 & Diesel spill container <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire district , the San Joaquin Valley Air Pollution Control District , and the local <br /> community development department for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for written approval <br /> prior to commencing work . All new submittals supersede previous ones . <br /> 3 . Email notification to ustRsigov . orq to arrange the following inspection appointments . <br /> All appointments must be scheduled at least 48 hours in advance . <br /> a . Corrosion protection : Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling . <br /> b . Spill bucket test : Verify minimum 5-gallon capacity . Pass a one hour hydrostatic test ( or <br /> equivalent) . Verify proper drainage method . <br /> c . Overfill prevention equipment position verification , to ensure the overfill flappers are at or <br /> below 95 % . <br /> d . Since concrete will be broken near the 87 & Diesel tank , a secondary containment test must <br /> be performed on the 87 & Diesel tank once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> The facility cannot receive fuel in the 87 & Diesel tank prior to the EHD inspection and approval . <br /> 4 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors <br /> State License Board ( CSLB) <br /> • A current UST Installation/Retrofitting certificate issued by the International Code Council <br /> ( ICC) <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 T 209 468 -3420 F 209 464- 0138 1 www. sjgov . org/ehd <br />