Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer F Industry Standard ā‘I— Professional Engineer <br /> Test Type © Pressure E Vacuum Ir Hydrostatic <br /> Test Equipment Used: Incon TS-STS Sump Test System <br /> Sump/UDC ID UST STP Reel UDC Transition Sump <br /> Sump Manufacturer Containment Solutions Containment Solutions Western Fiberglass <br /> Sump Depth (inches) 32 36 48 <br /> Sump Bottom to Top of 18 16 32 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1044 1044 1044 <br /> Initial Reading 7.5098 5.7213 3.3910 <br /> Test End Time 1059 1059 1059 <br /> Final Reading 7.5096 5.7213 3.3905 <br /> Change in Reading 0.0002 0 0.0005 <br /> Pass/Fail Criteria +/-0.002" +/-0.002" +/-0.002" <br /> Tightness Test Results Pass Fail Q Pass Fail E Pass © Fail 0 Pass © Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results © Pass © Fail Pass 0 Fail r] Pass © Fail I! Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />