My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022 AS BUILT PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1110
>
2300 - Underground Storage Tank Program
>
PR0547874
>
INSTALL_2022 AS BUILT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 11:20:57 AM
Creation date
7/11/2023 11:20:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022 AS BUILT PLAN
RECORD_ID
PR0547874
PE
2351
FACILITY_ID
FA0000794
FACILITY_NAME
7-ELEVEN INC # 41530
STREET_NUMBER
1110
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21821023
CURRENT_STATUS
01
SITE_LOCATION
1110 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 FUEL GC TO WORK WITH STORE GC ON <br />SCHEDULING. ANY CONFLICTS SHALL BE <br />BROUGHT TO THE ATTENTION OF THE SEI <br />PROJECT MANAGER. <br />2 FUEL GC RESPONSIBLE FOR ALL CONCRETE OVER <br /> TANKS AND PRODUCT PIPING (I.E. TANK SLAB AND <br /> DRIVE MATS). CONCRETE CHAIRS ARE BY <br /> SEI. <br />3 FUEL GC RESPONSIBLE FOR CANOPY FOOTINGS. <br />4 FUEL GC TO INSTALL CANOPY DRAINS (WHERE <br />APPLICABLE) TO POINT OF CONNECTION WITHIN <br />(10) FT OF DRIVE MATS. <br />5 FUEL EC TO INSTALL ALL FUEL RELATED <br />ELECTRONICS (I.E. DATA BOXES, EDH UNIT, <br />TURBINE RELAYS, ISOLATION RELAYS, ETC). <br />6 FUEL GC RESPONSIBLE FOR ALL ELECTRICAL <br />CONDUITS, SEAL-OFFS, ELECTRICAL J-BOXES PER <br />STATE, LOCAL, MANUFACTURERS AND SEI CODES <br />AND SPECIFICATIONS. <br />7 FUEL EC TO PULL WIRE FOR CANOPY LIGHTING, <br />INTERCOM, DISPENSERS, TURBINES AND <br />MONITORING SYSTEM DEVICES. <br />8 FUEL EC TO MAKE ALL FINAL CONNECTIONS TO <br />FUELING EQUIPMENT AND ELECTRONICS. <br />9 FUEL GC TO PULL TRADE PERMITS FOR FUELING <br />WORK (AS REQUIRED). <br />10 FUEL GC TO "CALL FOR" AND "BE PRESENT FOR" <br />ALL LOCAL REGULATOR INSPECTIONS AND <br />RESPONSIBLE FOR SCHEDULING ON-SITE <br />INSPECTIONS WITH APPROPRIATE SEI <br />REPRESENTATIVE RELATED TO FUELING. <br />11 FUEL GC TO COORDINATE WITH TANKNOLOGY <br />AND THE SEI CONSTRUCTION MANAGER FOR <br />TESTING OF FUELING SYSTEM. <br />12 FUEL GC TO HAVE PERSONNEL ON SITE FOR <br />TESTING. <br />13 FUEL GC RESPONSIBLE FOR CLOSE OUT PACKAGE <br />PER 7-11 MATRIX. <br />1 STORE GC TO WORK WITH FUEL GC ON <br />SCHEDULING. ANY CONFLICTS SHALL BE <br />BROUGHT TO THE ATTENTION OF THE SEI <br />PROJECT MANAGER. <br />2 STORE ELECTRICAL CONTRACTOR TO RUN <br />UNDERGROUND ELECTRICAL CONDUITS TO (10) FT <br />OUTSIDE OF BUILDING SLAB (COORDINATE <br />LOCATION, QUANTITY, SIZE AND TYPE OF CONDUIT <br />WITH FUEL CONTRACTOR). <br />3 STORE ELECTRICAL CONTRACTOR TO INSTALL <br />SEAL-OFFS (AS REQUIRED), ELECTRICAL <br />RACEWAYS, GUTTER BOXES, FUEL ELECTRICAL <br />PANELS, CIRCUIT BREAKERS AND FEEDERS. <br />4 STORE ELECTRICAL CONTRACTOR TO INSTALL <br />OVERHEAD CONDUIT FOR VEEDER ROOT FROM <br />ELECTRICAL ROOM TO LOCATION OF V/R ON <br />PLANS. <br />5 STORE GC RESPONSIBLE FOR ALL EXTERIOR <br />AREA LIGHTING, IRRIGATION AND AIR/VACUUM <br />UNIT SLAB AND POWER. <br />6 MONUMENT POLE SIGN TO BE PROVIDED AND <br />INSTALLED BY SIGNAGE CONTRACTOR. THE SIGN <br />IS TO BE FUTURE MEDIA ELECTRONIC PRICE SIGN. <br />STORE GENERAL CONTRACTOR <br />FUEL CONTRACTOR <br />1 7-ELEVEN CONVENIENCE STORE <br />2 FUELING CANOPY AND DISPENSERS <br />3 UNDERGROUND FUEL STORAGE TANKS AND SLAB <br />4 FUEL STORAGE TANK VENTS <br />5 AIR-VAC MACHINE <br />6 (2) EMERGENCY SHUT OFF SWITCHES, <br />REF 2-G10.0 <br />7 HORIZONTAL CLEAN AIR SEPARATOR <br />8 VEEDER ROOT SITE MONITOR CONSOLE <br /> (FIELD VERIFY) <br />9 OVERFILL ALARM. REF 4-G6.0 <br />10 MONUMENT SIGN <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />I. <br />J. <br />K. <br />L. <br />M. <br />N. <br />TANK BURIAL CHART - STORE (41530) <br />COMPONENT <br />FINISH GRADE ELEV. AT BEGINNING OF RUN (FT): <br />PIPE BURY (FT): <br />ELEVATION OF PIPE AT BEGINNING OF RUN (A-B) <br />PIPE LENGTH (LONGEST RUN) (FT): <br />PIPING RUN FALL (FT) (D*1/8" PER FT): <br />TOTAL CROSSOVERS/SWING JOINTS: <br />CROSSOVER/SWING JOINT DEPTH (FT): <br />ELEVATION AT END OF PIPE (FT) (C-E-G): <br />ADD FOR EXTRACTOR TEE AT SUMP: <br />TOP TANK ELEVATION (FT) (H-I): <br />HIGHEST FINISH GRADE ELEVATION AT TANK SLAB (FT): <br />MAX BURY DEPTH (K-J) (FT): MAX = 5.67' <br />LOWEST FINISH GRADE ELEVATION AT TANKS (FT): <br />MIN BURY DEPTH (M-J) (FT): MIN = 4.17' <br />TANK BURIAL DEPTH IS GOVERNED BY 7-ELEVEN MINIMUM TANK BURIAL DEPTH OF 4.17'. <br />THE TOP OF TANKS SHALL BE SET AT - 30.55'. <br />REGULAR VAPOR <br />35.59 <br />1.50 <br />34.09 <br />133 <br />1.39 <br />1 <br />1.00 <br />31.70 <br />1.00 <br />30.70 <br />35.00 <br />4.30 <br />34.72 <br />4.02 <br />VENT <br />35.50 <br />2.00 <br />33.50 <br />49 <br />0.51 <br />0 <br />0.00 <br />32.99 <br />1.50 <br />31.49 <br />35.00 <br />3.51 <br />34.72 <br />3.23 <br />35.59 <br />114 <br />1.19 <br />1 <br />1.00 <br />31.90 <br />1.00 <br />30.90 <br />35.00 <br />4.10 <br />34.72 <br />3.82 <br />1.50 <br />34.09E LOUISE AVEN. MAIN STFFFUNDERGROUND TRENCHING <br />10'-0" <br />UNDERGROUND TRENCHING <br />1 <br />2 <br />3 <br />47 <br />5 <br />100'-0" <br />6 <br />100'-0" <br />6 <br />9 <br />8 <br />10 <br />TC 36.25BC 35.75 TC 36.09BC 35.59 <br />TC 36.20 <br />BC 35.70 <br />TC 36.05BC 35.55 <br />TC 35.90 <br />BC 35.40 <br />TC 35.76 <br />BC 35.26 <br />34.87 <br />34.94 <br />35.00 <br />35.00 <br />34.98 <br />34.84 <br />34.83 <br />34.72 <br />35.50 <br />G0.1 FUELING ARCHITECTURAL SITE PLANRRTLHJob#:A20-366Scale:Date:Drawn By:Checked By:Rev. #Date Description11/17/20AS NOTEDSHEET:7-ELEVEN #415301110 N MAIN STMANTECA, CA 953367-ELEVEN, INC.3200 HACKBERRY ROAD, IRVING TEXAS 75063Proto 11-05-18 <br />ARCHITECTURE CIVIL ENGINEERING MEP ENGINEERING10755 SANDHILL ROAD, DALLAS, TEXAS 75238TEL: 214-343-9400 www.dimensiongrp.comDocuments prepared by TheDimension Group are to be usedonly for the specific project andspecific use for which they areintended. Any extension of use toother projects, by owner or anyother party, without the expressed,written consent of The DimensionGroup is done at the user's ownrisk. If used in a way other thanthat specifically intended, user willhold The Dimension Groupharmless from all claims and losses.12/02/20 <br />CAFUELING - USA <br />STORE CONTRACTOR RESPONSIBLE FOR ROUTING (29) <br />3/4" AND (3) 1" ROBROY PVC COATED GALVANIZED STEEL <br />CONDUITS (WITH PULL STRING) FROM ELECTRICAL ROOM <br />TO (10') PAST BUILDING SLAB. FUELING CONTRACTOR TO <br />PICK UP CONDUITS AT THIS LOCATION AND ROUTE TO <br />FINAL TERMINATION. FUELING CONTRACTOR <br />RESPONSIBLE FOR PULLING WIRE AND MAKING FINAL <br />TERMINATIONS. REF G16.0 FOR SPECIFICATIONS. <br />N <br />3/22/2021, 4:18:47 PM <br />20-3866.20-3868 <br />Roseville Submittals <br />5/17/2021, 12:31:28 PM <br />20-3866.20-3868 <br />Lumen Arceo <br />Built as per plans. 7/7/2022
The URL can be used to link to this page
Your browser does not support the video tag.