My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1601
>
2300 - Underground Storage Tank Program
>
PR0548590
>
REMOVAL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 1:29:35 PM
Creation date
8/3/2023 2:34:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2023
RECORD_ID
PR0548590
PE
2361 - UST FACILITY
FACILITY_ID
FA0001696
FACILITY_NAME
San Joaquin County Public Health Services
STREET_NUMBER
1601
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
Stockton
Zip
95205
CURRENT_STATUS
Temp inactive, non-billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1601 E Hazelton AVE Stockton 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN � 10 A Q U I N Environmental Health Department <br />- COUNTY <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location: 1601 E. HAZELTON AVENUE, STOCKTON CA <br />Owner SAN JOAQUIN CO PUBLIC HEALTH SERVICES Phone No: 20946&3411 <br />Contractor: RB ENVIRONMENTAL INC <br />License No: 747572 <br />Phone No: 209-932-0606 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />X 2. Submission of verification, e.g., load ticket, within 30 days of project,comletion <br />that one of the following materials was placed in the excavation in 12' lifts: <br />A. Pea gavel --smooth, rounded material not more than one-half (1/2) <br />inch in diameter <br />X B. Crushed rock--self:compacting material not more than three- <br />quarters (3/4) inch in cross sectional measurement. (Use of <br />crushed rock will not be permitted for backfill if contact will be made <br />between the backfill material and tanks/pipes made of poly resin <br />glass or similar materials.) <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 <br />days of project completion, or submission of verification that the select material <br />described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure <br />compliance with the Uniform Building Code Appendix Chapter 70, <br />Title <br />Sign <br />*Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.