My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
4600
>
2300 - Underground Storage Tank Program
>
PR0547496
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 1:11:55 PM
Creation date
8/16/2023 8:01:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0547496
PE
2351
FACILITY_ID
FA0027003
FACILITY_NAME
VALLEY FUELS INC
STREET_NUMBER
4600
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
24402031
CURRENT_STATUS
01
SITE_LOCATION
4600 S CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and 0 0 0 <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ 0 <br /> 0 0 <br /> ❑ 0 <br /> ❑ IM <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> All testing performed today was before fuel has been delivered. The turbines remained off for <br /> testing. No shutdown testing or line leak detection was performed. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.