My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1829
>
2300 - Underground Storage Tank Program
>
PR0546066
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 1:13:05 PM
Creation date
8/16/2023 1:45:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0546066
PE
2351
FACILITY_ID
FA0026050
FACILITY_NAME
7 ELEVEN, INC #41187
STREET_NUMBER
1829
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1829 N WILSON WAY
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> D Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> ® 3 GPH E 0.1 GPH D 0.2 GPH <br /> Has the testing apparatus been properly calibrated? 0 D D <br /> For emergency generator tank systems, does the LLD create an audible and visual D D <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ® ❑ 0 <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is LI LI 0 <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the D D <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ® D 0 <br /> monitoringsystem malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected ❑ J wl <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> LLD ID LLD Model _ Lines Monitored Pass Fail <br /> T1 87 _ Vaporless LD-2000 _ — 87 product <br /> T2 91 Vaporless LD-2000 91 product C� <br /> T3 DSL Vaporless LD-2000 DSL product ® D <br /> 11 LI <br /> D D <br /> D D <br /> D D <br /> D D <br /> D D <br /> D D <br /> D D <br /> D D <br /> Describe all answers marked "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.