My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-OOXX 44 <br /> FORWARD, INC. <br /> FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> Construction Specifications (SPRRs, section F), as well as the following with <br /> respect to closure of landfills at the Facility. <br /> 1. The Discharger shall submit a Final or Partial Final Closure and Post <br /> Closure Maintenance Plan (CPMP), in accordance with section G of the <br /> SPRRs, at least two years prior to the proposed closure of any portion of <br /> any landfill. <br /> 2. The Discharger shall close landfills with the final cover components <br /> proposed in the operative Preliminary Closure and Post-Closure <br /> Maintenance Plan (CPMP), as described in Finding 112 and Attachment <br /> F. <br /> 3. The Discharger shall obtain revised WDRs prior to closure of any landfill <br /> with a final cover other than the one(s) approved herein. <br /> 4. During or after final cover installation, the Discharger may perform minor <br /> modifications to problematic areas of the final cover, provided that: (a) the <br /> barrier layer of the final cover (e.g., geomembrane, GCL and/or <br /> compacted clay layer) remains intact; and (b) the Central Valley Water <br /> Board approves of such modifications. <br /> 5. If the final cover incorporates a geomembrane barrier, all edges of the <br /> final cover shall be sealed by connecting to the liner. <br /> 6. The Discharger shall apply a volume of seed, binder and nutrients to the <br /> vegetative/erosion-resistant layer sufficient to establish the vegetation <br /> proposed in the final closure plan. The Discharger shall also install any <br /> necessary erosion and sedimentation controls to protect vegetation while <br /> it is being established. <br /> 7. Critical interfaces of the final cover shall be laboratory-tested to ensure <br /> minimum design shear strength. The results of such testing shall be <br /> reported to the Central Valley Water Board as part of the Construction <br /> Quality Assurance (CQA) Report. <br /> 8. The Discharger shall include estimated final closure dates of the WMUs in <br /> the Annual Monitoring Report E.2 as specified in MRP R5-2023-00XX. <br />
The URL can be used to link to this page
Your browser does not support the video tag.