My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-OOXX 55 <br /> FORWARD, INC. <br /> FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> ATTACHMENT E—APPROVED LANDFILL LINER DESIGN <br /> 1. Single Composite Liner– from top to bottom: <br /> Component Base Side Slopes <br /> Operations Layer 12-inch thick protective cover soil 12-inch thick protective cover soil <br /> Filter Fabric Geotextile (8 oz/yd2) N/A <br /> LCRS 12-inch thick LCRS gravel Geocomposite drainage net <br /> Geotextile (12 oz/yd2) <br /> Cushion Layer (may be omitted if the LCRS gravel is N/A <br /> sub-angular to rounded) <br /> 60-mil HDPE Geomembrane 60-mil HDPE Geomembrane <br /> Composite Liner Geosynthetic clay liner (GCL) or <br /> 24-inch thick low-permeability soil 24-inch thick low-permeability <br /> (minimum permeability soil <br /> 1 x 10-7 cm/sec) (minimum permeability <br /> 1 x 10-7 cm/sec) <br /> Foundation Layer Prepared subgrade Prepared subgrade <br /> Note: The side slope liner system will be anchored in a trench located at the top of the <br /> excavation slope. <br /> 2. Surface Impoundment – from top to bottom: <br /> Component Base <br /> Primary Composite Liner 60-mil HDPE Geomembrane <br /> LCRS Geonet or Geocomposite LCRS <br /> 60-mil HDPE Geomembrane <br /> Secondary Composite Liner <br /> Geosynthetic clay liner (GCL) <br /> Foundation Layer Prepared subgrade (graded and compacted native soil) <br /> 3. Sump and Pan Lysimeter–from top to bottom: <br /> Component Base <br /> Sump Operations Layer 12-inch thick protective cover soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.