My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT [TENTATIVE] WASTE DISCHARGE REQUIREMENTS ORDER R5-2023-OOXX 77 <br /> FORWARD, INC. <br /> FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> STANDARD PROVISIONS & REPORTING REQUIREMENTS <br /> 21. The Discharger shall incorporate into the closure and post-closure <br /> maintenance plan a cover-integrity monitoring and maintenance program <br /> which includes at least the following: a periodic leak search, periodic <br /> identification of other problem areas, prompt cover repair, and vegetation <br /> maintenance [Title 27, § 21090(a)(4)]. <br /> 22. The Discharger shall complete a final cover survey upon completion of <br /> closure activities for that portion of the landfill. The final cover surveys <br /> shall include an initial survey and map [Title 27, § 21090(e)(1). Every <br /> five years, the Discharger shall conduct a survey of the closed landfill <br /> cover and submit an iso-settlement map accurately depicting the <br /> estimated total change in elevation of each portion of the final cover's low- <br /> hydraulic-conductivity layer [Title 27, § 21090(e)(2)]. <br /> 23. Within 30 days of completion of all closure activities, the Discharger shall <br /> certify that all closure activities were performed in accordance with the <br /> most recently approved final closure plan and CQA Plan, and in <br /> accordance with all applicable regulations. The Discharger shall also <br /> certify that closed landfill units shall be maintained in accordance with and <br /> approved post-closure maintenance plan [Title 27, § 21710(c)(6)]. <br /> 24. Within 180 days of completion of closure construction activities, the <br /> Discharger shall submit final documentation of closure, including the <br /> Certification of Closure. The closure documents shall include a final <br /> construction quality assurance report and any other documents necessary <br /> to support the certification [Title 27, § 21880]. <br /> 25. The post-closure maintenance period shall continue until the Central <br /> Valley Water Board determines that wastes remaining in the landfill unit(s) <br /> no longer pose a threat to water quality [Title 27, § 20950(a)(1)]. <br /> 26. The Discharger shall conduct a periodic leak search to monitor of the <br /> integrity of the final cover in accordance with the schedule in the approved <br /> final post- closure maintenance plan [Title 27, § 21090(a)(4)(A)]. <br /> 27. The Discharger shall periodically inspect and identify problems with the <br /> final cover including areas that require replanting, erosion, areas lacking <br /> free drainage, areas damaged by equipment operations, and localized <br /> areas identified in the required five-year iso-settlement survey [Title 27, <br /> § 21090(a)(4)(B)]. <br /> 28. The Discharger shall repair the cover promptly in accordance with a cover <br /> repair plan to be included in the final post-closure maintenance plan <br /> [Title 27, § 21090(a)(4)(C)]. <br />
The URL can be used to link to this page
Your browser does not support the video tag.