Laserfiche WebLink
Project Tasks <br /> The following tasks are identified for this project: <br /> 1 Mobilization - Site set up and take down <br /> 2 Utilities-Clearance <br /> 3 Drilling - Contractor oversight <br /> 4 Monitoring -Air monitoring using hand held or stationary equipment- non-radiation <br /> 5 Sampling - Pressurized air sampling using sample cylinders or similar devices <br /> 6 Sampling - Groundwater sampling using bailers (contractor oversight) <br /> 7 Decontamination -Arcadis oversight of contractors performing decontamination <br /> 8 Waste-Arcadis oversight of contractors performing IDW containment, segregation and/or sampling <br /> 9 Monitor well -Well installation, development, or purging contractor oversight <br /> 10 Aquifer testing - Using mechanical methods <br /> 11 Select <br /> 12 Select <br /> 13 Select <br /> 14 Select <br /> 15 Select <br /> 16 Select <br /> 17 Select <br /> 18 Select <br /> 19 Select <br /> 201 Select <br /> The following documents and/or plans associated with the above task(s) are required and attached: <br /> -The Arcadis Utilities and Structures Checklist must be used for utility clearance activities. <br /> -A California Heat Illness Prevention Plan (HIPP) and Injury and Illness Prevention Plan (IIPP). <br /> -Current Arcadis COVID-19 Prevention Recommendations and Guidance <br /> ❑X Required Checklists/Work Forms Required Permits <br /> Tailgate Safety Briefing Form Soil Vapor Probe Installation <br /> Vehicle Inspection Checklist Groundwater Well Installtion <br /> Utilities and Structures Checklist <br /> Equipment lists for CDCR Property Q Required H&S Standards <br /> Bloodborne Pathogens ARC HSGE005 <br /> First Aid/CPR ARC HSGE004 <br /> Heat Stress Prevention ARC HSIH013 <br /> Short Service Employees (SSEs) <br /> SSEs are identified in the Roles and Responsibilities section of this HASP. Project team must ensure <br /> SSEs with <1 year of exerience at Arcadis working on this project have completed: 1) participation in <br /> New Hire Call within 7 days, 2)complete New Hire Orientation within 14 days, 3) complete SSE TIP as <br /> observee within 60 days, and 4) complete the SSE Culture Assessment between 60-90 days of hire. <br /> Inexperienced Workers must be assigned a mentor for new or unfamiliar task work (ARC HSGE019). <br />