Laserfiche WebLink
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br /> Simulated Groundwater Pumping in Entire Model Area <br /> (San Joaquin & portions of Sacramento, and Stanislaus Counties) <br /> 1,800,000 <br /> Historical Simulation 1970-2004 Predictive Simulation 2000-2030 <br /> 1,600,000 <br /> 1,400,000 <br /> *, 1,200,000 <br /> a <br /> m <br /> as <br /> z, <br /> Q 1,000,000 <br /> 800,000 <br /> 600,000 <br /> 400,D0a <br /> O N W cQ O N � So -D O NW CO O N W CO O N -V W CQ O N � '0 CO O <br /> n r— r- n r— W W CO W W M M 0 M M O O O O O N N N N NM <br /> aS 62 67 Q7 61 ❑] a7 62 62 ❑7 67 62 ❑7 QY 6'i O O O O O O O O O O O O O O O O <br /> r r r r r M N N N N N N N N N N N N N N N <br /> Year <br /> Figure 2-23 Simulated Groundwater Pumping <br /> Source: Camp Dresser & McKee Inc. <br /> Northeastern San Joaquin County Section 2 <br /> Groundwater Banking Authority 67 Hydrogeology) <br />