My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0087014_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARROLTON
>
18163
>
2600 - Land Use Program
>
SR0087014_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2024 9:12:12 AM
Creation date
8/17/2023 1:11:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0087014
PE
2602
STREET_NUMBER
18163
Direction
S
STREET_NAME
CARROLTON
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24538026
ENTERED_DATE
8/1/2023 12:00:00 AM
SITE_LOCATION
18163 S CARROLTON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br /> 8 Integrated Regional Conjunctive Use Program <br /> The following section describes the options available to the Authority in the development of the <br /> Integrated Regional Conjunctive Use Program. The Conjunctive Use Program is the key <br /> element in fulfilling the purpose of the Plan to ensure the sustainability of Groundwater <br /> resources in Eastern San Joaquin County. For organizational purpose, project options are <br /> grouped into water supply elements by source, surface water storage and major conveyance <br /> projects, and groundwater recharge components by program or entity. <br /> 8.1 Supply Elements <br /> Supply elements are grouped by river system and are a combination of reallocations, new <br /> water, and transfers. Entitlements to water are supported by legal claims based on existing <br /> water right permits, water service contracts and agreements, and pending water right <br /> applications. A map of the waterways discussed can be seen in Figure 8-1. <br /> 8.1.1 Stanislaus River <br /> As listed in Table 2-5, Stanislaus River supplies are available to the SSJID and OID via pre- <br /> 1914 water rights and to the Stockton East Water District and Central San Joaquin Water <br /> Conservation District through Central Valley Project (CVP) contracts. SSJID and OID are senior <br /> water right holders to 600,000 of per year from the yield of New Melones Reservoir, 320,000 of <br /> of which are used directly in the GMA. SEWD and CSJWCD hold junior contracts for a total of <br /> 155,000 of subject to other users requirements. <br /> The Stanislaus River watershed consists of approximately 904 square miles with an annual <br /> average runoff of approximately 1 million af. The majority of the runoff occurs from November <br /> to July and peaks during the summer months when snow melt is greatest. More than half the <br /> runoff is snowmelt-derived (USBR, Website, updated). The USACE constructed New Melones <br /> Dam on the Stanislaus River in 1978, replacing the original Old Melones Dam constructed in <br /> 1924 jointly by OID and SSJID. New Melones Reservoir has a capacity of 2.4 million of and is <br /> operated as part of the CVP under the USBR's Interim Operations Plan. The average annual <br /> runoff at New Melones for the 74 years from 1904 to 1977 was 1.12 million af. <br /> Urban growth in South San Joaquin County in the Cities of Lathrop, Manteca, Escalon and <br /> Ripon and the increased irrigation efficiencies made over the years have made water available <br /> for transfer by SSJID and OID. Beginning in 2005, SSJID will serve the urban communities of <br /> Escalon, Manteca, Lathrop, and Tracy with surplus water through the South County Surface <br /> Water Supply Project. SSJID and OID also currently make available to SEWD up to 30,000 <br /> of/yr through the New Melones Conveyance System specifically for urban use as part of a 10- <br /> year water transfer agreement which expires in 2009. The agreement is renewable pending <br /> future water availability and negotiation. SSJID and OID have also made on occasion water <br /> available to CSJWCD for irrigation. <br /> In 1978, New Melones Dam was completed and the reservoir was filled. At the time of <br /> development and construction of New Melones, the expected yield of the project was fully <br /> allocated to meet the needs of the contracts in the Eastside Unit of the CVP. SSJID and OID <br /> held the most senior of rights and were allocated their full historic diversion amount. CSJWCD <br /> executed both a firm and interim CVP contract and SEWD an interim CVP contract; both are <br /> junior to other CVP contract for New Melones water. The CVP contracts provide up to 155,000 <br /> of per year subject to inflow, storage, and senior requirements. CSJWCD would receive up to <br /> 49,000 of of firm yield and an additional 31,000 of when available. SEWD would receive up to <br /> 75,000 of when available. <br /> Northeastern San Joaquin County Section 8 <br /> Groundwater Banking Authority 103 Integrated Conjunctive Use Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.