Laserfiche WebLink
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br /> Pump Station <br /> High Water Level = 23{x' 3" <br /> To Duck Creek <br /> Reservoir <br /> Low Water Level = 125' <br /> 1 0' <br /> Debris Gate 'f Cut;Cover Pipe Tunnel <br /> & Stoplogs <br /> Pipe Support <br /> From Pump Station <br /> at Camanche <br /> Reservoir <br /> High Water Level <br /> Riprap <br /> i<n��,Scale <br /> Figure 8-7 Duck Creek from Camanche Reservoir Inlet and Outlet Diagram <br /> Source: HDR, Inc. <br /> Northeastern San Joaquin County Section 8 <br /> Groundwater Banking Authority 118 Integrated Conjunctive Use Program <br />