Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-2300116 <br /> SOUTH KASSON LLC <br /> Lot Line Adjustment Application No. PA-2300116 was approved by the Community Development <br /> Department on October 24, 2023,which is the effective date of approval. This approval will expire on <br /> April 24, 2026, which is thirty (30) months from the effective date of approval, unless a Notice of Lot <br /> Line Adjustment has been recorded and a Record of Survey has been filed, if required by the Land <br /> Surveyors'Act. <br /> Unless otherwise specified, all Ordinance Requirements shall be complied with prior to approval of a <br /> Notice of Lot Line Adjustment. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: [209]468-3121) <br /> a. APPROVAL:This approval is for a Lot Line Adjustment application between two parcels as shown on <br /> the site plan dated August 8,2023. <br /> b. NOTICE OF LOT LINE ADJUSTMENT: A"Notice of Lot Line Adjustment" shall be recorded prior to <br /> conveyance of property through deeds by the owner. Legal descriptions of the resultant properties <br /> shall be submitted to the Surveyor's Division for review and forwarding to the Community Development <br /> Department. The legal descriptions shall be prepared, stamped and signed by a Registered Civil <br /> Engineer, qualified to practice Land Surveying per Section 8731 of the Land Surveyors' Act, or a <br /> Licensed Land Surveyor. (Development Title Section 9-872.4) <br /> c. LOT SIZE:The following requirements shall apply: <br /> (1) Parcel 1 shall be a minimum of one-acre in size. (Development Title Table 9-201-030) <br /> (2) Parcel 2 and Parcel 3 shall be a minimum of two acres in size. (Development Title Table 9-202- <br /> 030) <br /> d. LOT WIDTH:The following requirements shall apply: <br /> (1) Parcel 1 shall have a minimum lot width of 150 feet,from the front yard setback line. <br /> (Development Title Table 9-201-030) <br /> (2) Parcel 2 and Parcel 3 shall have a minimum lot width of 150 feet,from the front yard setback line. <br /> (Development Title Table 9-202-030) <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209] 468-3000, see memo dated September 27, 2023) <br /> NOTES AND INFORMATION ONLY: <br /> Access to these parcels is not created by this Lot Line Adjustment. A Zoning Compliance Review application <br /> for a Private Right-of-Way shall be required before issuance of a non-agricultural building-permit for proposed <br /> Parcel(s) 2 and 3. <br /> See Pacific Gas and Electric Company letter dated October 12, 2023. <br /> See Environmental Health Department letter dated October 9, 2023. <br /> See South San Joaquin County Fire Authority letter dated September 28, 2023. <br /> PA-2300116—Conditions of Approval 1 <br />