My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> Special-status Vernal Pool Invertebrates <br /> The longhorn fairy shrimp and vernal pool fairy shrimp are covered species under <br /> the SJMSCP(see Sections 5.2.4.4 and 5.5.9). Per the SJMSCP, if final site design <br /> is confirmed to be within 250 feet of the ephemeral pond,then one of the following <br /> will occur: <br /> 1. Receive concurrence from USFWS that the ephemeral pond does not <br /> support special-status vernal pool invertebrate species given the lack of <br /> ponding observed in historic aerial imagery. <br /> 2. Conduct pre-construction surveys in compliance with current USFWS <br /> protocols to determine the presence or absence of longhorn fairy shrimp <br /> within ponds southwest of 1-580 unless complete avoidance of vernal <br /> pools and/or wetlands is achieved, per Section 5.2.2 of SJMSCP. <br /> 3. Conduct a hydrologic study to determine if a setback less than 250 feet <br /> would maintain the hydrology of the ephemeral pond and achieve the <br /> same, if not greater, habitat value as a 250-foot setback. If verified, <br /> conduct a site visit with USFWS to inspect the unique characteristics of <br /> the Project site to request approval to reduce the setback to be less than <br /> 250 feet. If approved, ensure activities inconsistent with the maintenance <br /> of the ephemeral pond within the approved setback are prohibited, per <br /> Section 5.5.9 of SJMSCP.This option provides an alternative mitigation <br /> approach which allows complete avoidance of SJMSCP Covered Species <br /> and habitats through the implementation of the measures established in <br /> Section 5.5.9. Under this scenario,compensation is not required as long <br /> as the Section 5.5.9 measures are followed. <br /> 4. If pre-construction surveys are found to be prohibitively expensive or result <br /> in Project delays and a setback less than 250 feet is not feasible, assume <br /> presence of longhorn fairy shrimp and vernal pool fairy shrimp and pay <br /> compensatory mitigation in accordance with the mitigation ratios and <br /> requirements in the SJMSCP. <br /> Burrowing Owl <br /> This species is covered under the SJMSCP.The following measure would be <br /> implemented in accordance with the SJMSCP(see Section 5.2.4.15)and as best <br /> management practices to mitigate impacts: <br /> A qualified biologist shall conduct preconstruction surveys prior to(or,for some <br /> Incidental Take Minimization Measures,during)ground-disturbing activities to <br /> determine if SJMSCP Covered Species are present and/or verify that the <br /> appropriate Incidental Take Minimization Measures have been implemented, as <br /> specified in the conditions of Project approval(see SJMSCP, Section 5.2.2.1 b). <br /> Specifically,the Project owner shall have preconstruction surveys performed no <br /> less than 14 days prior to the initiation of equipment sta in or ground disturbing <br /> Griffith Energy Storage Project ES-12 Tetra Tech/SCH2022120675 <br /> Draft Environmental Impact Report August 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.