Laserfiche WebLink
Executive Summary <br /> Level of <br /> Potential Impacts Significance Mitigation Measures <br /> authorization issued under CESA,through the purchase of CDFW- <br /> approved bank credits or through preservation of habitat in perpetuity, <br /> including suitable habitat currently preserved by the applicant. <br /> BIO-2: Worker Environmental Awareness Program and Best Management <br /> Practices for Biological Resources <br /> During construction, O&M, and decommissioning of the facility,the Project owner <br /> shall implement the following general avoidance and protective measures to <br /> protect special-status wildlife species and habitats in all Project areas: <br /> 00 Prior to and for the duration of construction activities,the Project owner, or its <br /> contractor, shall implement a Worker Environmental Awareness Program to <br /> train all on-site construction personnel how to recognize and protect <br /> biological resources on the Project site. The Worker Environmental <br /> Awareness Program training shall include a review of the special-status <br /> species and other sensitive biological resources that could exist in or near <br /> the Project site, the locations of sensitive biological resources and their legal <br /> status and protections, and measures to be implemented for avoidance of <br /> these sensitive resources, highlighting CTS, CRLF,western spadefoot, San <br /> Joaquin coachwhip, longhorn fairy shrimp,vernal pool fairy shrimp, BUOW, <br /> Swainson's hawk,white-tailed kite, nesting birds, SJKF,American badger, <br /> big tarplant, California glossy snake, and Crotch's bumble bee. <br /> 00 The Project owner shall limit and flag the areas of disturbance. Parking <br /> areas, new roads, staging, storage, excavation, and disposal site locations <br /> shall be confined to the smallest areas possible. To the extent feasible,the <br /> Project shall be designed to retain small mammal burrows and other suitable <br /> estivation habitat for amphibians(e.g., underground holes, cracks, or niches) <br /> and will minimize habitat impacts. Buffers and avoidance areas established <br /> for biological resources, as described in BIO-1 and BIO-3, shall be <br /> delineated with highly visible stakes and/or flagging prior to construction. <br /> Construction-related activities and use of vehicles and equipment shall not <br /> occur within protected buffers or avoidance areas. <br /> 00 If at any time during Project construction a special-status species enters the <br /> site or otherwise may be impacted by the Project, all Project activities shall <br /> cease. The appropriate measures from the SJMSCP relevant to the species <br /> found would be implemented, and the USFWS and/or CDFW shall be <br /> contacted if necessary to determine the appropriate course of action. No <br /> special-status species shall be captured or relocated without prior <br /> authorization from the CDFW and/or USFWS. <br /> Griffith Energy Storage Project ES-18 Tetra Tech/SCH2022120675 <br /> Draft Environmental Impact Report August 2023 <br />