My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN _JOAQUIN Community <br /> Development Department <br /> .Ak! COUNTY Planning Building Code Enforcement Fire Prevention GIS <br /> Greatness grows here. <br /> caCikoR��P <br /> NOTICE OF AVAILABILITY OF DRAFT ENVIRONMENTAL IMPACT REPORT <br /> Notice is hereby given on August 28, 2023 that San Joaquin County Community Development Department released a Draft <br /> Environmental Impact Report(Draft EIR)for the following project: <br /> Griffith Energy Storage Project <br /> Site Approval No. PA-2200137 S00015801 (2675)s$ <br /> (SCH#2022120675) <br /> Project Location: The Project site is approximately 0.9 mile southwest of Interstate 580 and approximately 5 miles southwest of <br /> the city of Tracy adjacent to Pacific Gas and Electric's (PG&E)Tesla Substation, as shown on Figure 1. The Project site consists <br /> of approximately 32 acres of a 160-acre parcel (Assessor Parcel Numbers: 209-100-19; 99B-7885-002; 99B-7590-1-3). <br /> The 32-acre Project site is located at 20042 W. Patterson Pass Road within unincorporated San Joaquin County, California. <br /> Currently, the site is grazing land, with two houses within the boundaries of the Project site but outside of the area that would be <br /> disturbed by the Project. The Project site is bounded to the north by grazing land, rural residences, the West Patterson Pass, and <br /> the Union Pacific Railroad. To the east lies grazing land and open space. Rural residences, grazing land, and open space bound <br /> the Project to the south. The Project is bounded by rural residences, grazing land, and the PG&E Tesla Substation to the west <br /> within Alameda County. The County of San Joaquin General Plan Land Use Map designates the Project site as General <br /> Agricultural, and the County's Zoning Map identifies the site as Agricultural General-160. Regional access to the Project site is <br /> provided by Interstate 580 located approximately 0.9 miles to the northeast. <br /> Project Description: The Project would involve grading of the project site for the new construction and operation of a 400- <br /> megawatt battery energy storage system to provide reliable and flexible power to the local electrical system. The Project would <br /> interconnect at the Tesla Substation immediately adjacent to the site in Alameda County via a 230-kilovolt interconnection <br /> generation tie (gen-tie) line. The energy storage facility is anticipated to house lithium-ion batteries totaling 400 megawatts of <br /> energy. Project construction would begin in 2024 and is anticipated to come online in 2025. <br /> The Project would contain pad-mounted energy storage units, in addition to inverters, supervisory control and data acquisition <br /> (SCADA) equipment, a collector substation, and an interconnection gen-tie line to the Tesla Substation. The Project would also <br /> include related and supporting facilities such as on-site service roads, gates, security fencing, and temporary laydown and <br /> construction areas. <br /> The Project seeks the following entitlements/approvals from San Joaquin County: <br /> • Site Approval (application number PA-2200137) <br /> • Williamson Act Cancellation <br /> Draft EIR Document Review and Availability: The public review and comment period for the Draft EIR is 45 days beginning on <br /> August 28, 2023 and concluding on October 12, 2023. Due to the COVID-19 pandemic, printed hard copies will not be available <br /> to the public. However, the Draft EIR can be viewed and/or downloaded from the County website using the following link: <br /> https://www.sigov.org/com mdev/cg i- <br /> bin/cdyn.exe/file/Planning/Environmental%20impact%20Reports/Griffith%20Energy%2OStorage%2OProject%2ODr <br /> aft%20EIR.pdf <br /> Comments/Questions: Comments and/or questions regarding the Draft EIR may be directed to Isabelle Loh, Contract Planner <br /> at iloh(a)migcom.com or to the address below: <br /> Isabelle Loh, Contract Planner <br /> MIG, Inc. <br /> 800 Hearst Ave, <br /> Berkeley, CA 94710. <br /> 1810 E Hazelton Avenue I Stockton, California 95205 1 (209)468-3121 1 www.sjgov.org/commdev <br />
The URL can be used to link to this page
Your browser does not support the video tag.