2 Project Description <br /> Equipment Daily <br /> Usage Daily Worker VendorTotal <br /> Construction Phase Equipment Type Quantity <br /> Rubber Tired Loaders 2 8 <br /> Skid Steer Loaders 4 8 <br /> Trenchers 2 8 <br /> Dumpers/Tenders 8 8 <br /> Generators 2 24 <br /> Generators 2 8 <br /> Air Compressors 4 8 <br /> Cranes 2 8 <br /> Excavators 4 8 <br /> Energy Storage Generator Sets 4 8 <br /> Enclosure and 120 20 3600 <br /> Substation Installation Forklifts 2 8 <br /> Plate Compactors 2 8 <br /> Rollers 2 8 <br /> Tractors/Loaders/Backhoes 6 80 <br /> Air Compressors 2 8 <br /> Cranes 2 8 <br /> Gen-Tie Line Foundation Forklifts 2 8 <br /> and Tower Erection Generator Sets 2 24 40 4 600 <br /> Pumps 2 8 <br /> Welders 2 8 <br /> Forklifts 2 8 <br /> Gen-Tie Line Pulling and Generator Sets 2 8 49 4 600 <br /> Stringing <br /> Tractors/Loaders/Backhoes 2 8 <br /> Testing and Off-Highway Trucks 3 8 100 0 0 <br /> Commissioning <br /> 1/Number reflects daily one-way trips. <br /> 2/Number reflects total trips per phase. <br /> 2.5.3.3 Grading and Site Preparation <br /> The energy storage facility site located on 32 acres in San Joaquin County would be prepared for <br /> construction. Rough grading may be performed where required to accommodate the support <br /> structures and access roads. Grubbing and grading would occur on the site to achieve the <br /> required surface conditions. Site preparation may include application of pre-emergent herbicides <br /> formulated to minimize impacts on wildlife. Application would be in accordance with federal, state, <br /> and San Joaquin County regulations and would be applied by a California state-licensed pesticide <br /> applicator. <br /> Retention basins may be required for hydrologic control. The specific locations for these retention <br /> basins would be determined during final engineering design and would be located within the 32- <br /> acre disturbance area. Access roads would be gravel or aggregate base depending on the final <br /> site geotechnical report. A temporary staging area, anticipated to be located on the southwest <br /> end of the site, would be constructed to hold materials and construction equipment. <br /> Griffith Energy Storage Project 2-11 Tetra Tech/SCH 2022120675 <br /> Draft Environmental Impact Report August 2023 <br />