My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 36 Date: 6/12/2023 11:26 AM <br /> Griffith Energy Storage Project- San Joaquin County, Annual <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> Griffith Energy Storage Project <br /> San Joaquin County, Annual <br /> 1.0 Project Characteristics <br /> 1.1 Land Usage <br /> Land Uses Size Metric Lot Acreage Floor Surface Area Population <br /> General Heavy Industry 1,307.00 1000sgft 30.00 1,307,000.00 0 <br /> 1.2 Other Project Characteristics <br /> Urbanization Rural Wind Speed(m/s) 2.7 Precipitation Freq(Days) 51 <br /> Climate Zone 2 Operational Year 2025 <br /> Utility Company Pacific Gas and Electric Company <br /> CO2 Intensity 203.98 CH4Intensity 0.033 N20 Intensity 0.004 <br /> (Ib/MWhr) (Ib/MWhr) (Ib/MWhr) <br /> 1.3 User Entered Comments & Non-Default Data <br /> Project Characteristics - <br /> Land Use- <br /> Construction Phase- Provided by applicant. <br /> Off-road Equipment- Provided by applicant. <br /> Off-road Equipment- Provided by applicant. <br /> Off-road Equipment- Provided by applicant. <br /> Off-road Equipment- Provided by applicant <br /> Off-road Equipment- Provided by applicant. <br /> Trips and VMT- Provided by applicant; HHDT vehicle class assumed for vendor trips and haul trips. <br /> Grading - <br /> Vehicle Trips - 1-2 workers on a weekly basis. <br /> Vehicle Emission Factors- <br />
The URL can be used to link to this page
Your browser does not support the video tag.