My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaIEEMod Version: CalEEMod.2020.4.0 Page 4 of 36 Date: 6/12/2023 11:26 AM <br /> Griffith Energy Storage Project- San Joaquin County, Annual <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br /> tblOffRoadEquipment PhaseName Site and Substation Preparation and <br /> Grading <br /> --------------- - ----------f------------------------------t-----------------------------f-------------------------- <br /> tblOffRoadEq uipment PhaseName i Energy Storage Enclosure and <br /> Substation Installation <br /> ----------------------------f------------------------------F----------------------------- ------------------------- <br /> tblOff Road Equipment PhaseName i Site and Substation Preparation and <br /> � <br /> �' Grading <br /> -----------------------------f------------------------------F----------------------------- -------------------------- <br /> tblOffRoadEquipment PhaseName } Site and Substation Preparation and <br /> Grading <br /> ---------------- - ----------+------------------------------f----------------------------- -------------------------- <br /> tblOffRoadEquipment PhaseNamev i Site and Substation Preparation and <br /> Grading <br /> ----------------------------- ------------------------------F----------------------------- -------------------------- <br /> tblOffRoadEquipment PhaseName Testing and Commissioning <br /> ---------------- - ----------Y------------------------------t-------------------------------------------------------- <br /> tblOffRoadEq uipment PhaseName i Energy Storage Enclosure and <br /> Substation Installation <br /> ----------------------------- ------------------------------F-----------------------------4-------------------------- <br /> tblOffRoadEquipment PhaseName r Gen-Tie Line Foundation and Tower <br /> s Erection <br /> ---------------- - ----------+------------------------------f----------------------------- -------------------------- <br /> tblOffRoadEquipment PhaseName v i Site and Substation Preparation and <br /> Grading <br /> ---------------- - ---------- ------------------------------F----------------------------- -------------------------- <br /> tblOffRoad Equipment <br /> q uipment PhaseName i Energy Storage Enclosure and <br /> Substation Installation <br /> ----------------------------- ------------------------------F-----------------------------4-------------------------- <br /> tblOffRoadEquipment PhaseName r Site and Substation Preparation and <br /> • s Grading <br /> ---------------- - ----------+------------------------------f----------------------------- -------------------------- <br /> tblOffRoadEquipment PhaseName v i Site and Substation Preparation and <br /> Grading <br /> ---------------- - ---------- ------------------------------F----------------------------- -------------------------- <br /> tblOffRoad Equipment <br /> q uipment PhaseName i Site and Substation Preparation and <br /> Grading <br /> ---- ---- ---- ---- ---- �---- ---- ---- ---- ---- F-----------------------------4-------------------------- <br /> tblOffRoadEquipment UsageHours r 7.00 8.00 <br /> tblOffRoadEquipment UsageHours r 7.00 8.00 <br /> tblOffRoadEquipment UsageHours r 7.00 8.00 <br /> tblOffRoadEquipment UsageHours r 7.00 8.00 <br /> tblOperationalOffRoadEquipment OperDaysPerYear r 260.00 6.00 <br /> tblOperationalOffRoadEquipment OperOffRoad EquipmentNumber r 0.00 3.00 <br /> tblProjectCharacteristics Urbanization Level r Urban Rural <br /> tblSolidWaste SolidWasteGeneration Rate } 1,620.68 15.00 <br /> -----------------------------Y-------------------------------------------------------------r------------------------- <br /> tblTripsAndVMT Haul ingTripNumber } 125.00 3,680.00 <br /> -----------------------------Y------------------------------r------------------------------r------------------------- <br /> tblTripsAndVMT Haul ingTripNumber } 0.00 3,600.00 <br /> -----------------------------Y------------------------------r------------------------------r------------------------- <br /> tblTripsAndVMT Haul ingTripNumber 0.00 600.00 <br /> -----------------------------Y------------------------------r------------------------------r------------------------- <br /> tblTripsAndVMT Haul ingTripNumber } 0.00 600.00 <br /> --------------------------- ----------------------------- ------------------------------ ------------------------ <br /> tblTripsAndVMT VendorTripN umber 0.00 4.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.