Laserfiche WebLink
Acoustical Analysis Report Griffith Energy Storage Project <br /> Table 6. Received Construction Equipment Noise Levels by Stage (dBA Leq, Lma),) <br /> UTM Coordinates Distance to Construction Noise Levels <br /> Participation — (meters) — Center of <br /> Status Construction Stage 2 Stage 3 Stage Stage 5 <br /> Easting Northing (feet) <br /> I I Leq Lmax Leq Lmax Leq Lrnj Leq Lmax Leq Lmax <br /> NSA-1 Non-participant 628459 4176119 6075 52 56 52 57 47 51 46 49 14 18 <br /> NSA-2 Non-participant 627076 4174143 1850 62 67 62 68 57 62 56 59 24 28 <br /> NSA-3 Non-participant 627580 4175135 1850 62 67 62 68 57 62 56 59 24 28 <br /> NSA4 Non-participant 627733 4175104 1975 62 66 62 67 57 61 56 59 24 28 <br /> NSA-5 Non-participant 628927 4175671 6125 52 56 52 57 47 51 46 49 14 18 <br /> NSA-6 Participant 627115 4174455 1025 68 72 68 73 62 67 61 64 30 34 <br /> NSA-7 Participant 627139 4174478 925 68 73 69 74 63 68 62 65 30 34 <br /> NSA-8 Participant 627122 4174991 1550 64 68 64 69 59 63 58 61 26 30 <br /> NSA-9 Participant 627146 4174731 900 69 73 69 74 64 68 62 66 31 35 <br /> NSA-10 Non-participant 626174 4174293 4125 56 60 56 61 50 55 49 52 18 21 <br /> NSA-11 Non-participant 627422 4175128 1700 63 67 63 69 58 62 57 60 25 29 <br /> OTETRA TECH 10 August 2023 <br />