My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acoustical Analysis Report Griffith Energy Storage Project <br /> 5.0 VIBRATION CALCULATION METHODOLOGY <br /> Vibration levels for activities associated with Project construction were based on the average of <br /> source levels in PPV published with the Federal Transit Administration (2006) Noise and Vibration <br /> Manual,which documents several types of construction equipment measured under a wide variety of <br /> construction activities. Using the documented vibration levels as input into a basic propagation <br /> model,construction vibration levels were calculated at the nearest Project site boundary and then at <br /> the NSA structure. <br /> 5.1 Projected Vibration Levels During Construction <br /> As discussed in Section 4.2, Project construction would be completed in five work stages.This <br /> vibration analysis evaluated the worst-case vibration source,which would be the pile driver. Based on <br /> vibration propagation calculations,construction vibration levels are predicted to be 0.00255 PPV <br /> in/sec,or 56 VdB,at the nearest non-participating residential receptor,which is approximately 1,000 <br /> feet from the site.These levels are based on the worst-case vibration producing equipment and it is <br /> expected that other vibration generating equipment proposed for the Project construction would <br /> result in lower vibration levels.Vibration levels at the nearest non-participating sensitive receptor will <br /> be below the minimum vibration level for human perception of 65 VdB. <br /> OTETRA TECH 12 August 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.